Motherwell
MTHScotlandManaged by ScotRail
How this station is performing
Motherwell had 84,960 scheduled stops to Period 7 of 2026-27, about 233 a day. 80.2% of recorded arrivals were within three minutes of the timetable and 2.4% of scheduled stops were cancelled.
Motherwell opened on 8 May 1843. It was moved to the site it uses now on 31 July 1885. Of the 5 stations nearest to it with a known opening date, Motherwell is the oldest; the next oldest, Chatelherault, dates from 1866.
The nearest stations to Motherwell are Airbles (1.1 km south), Holytown (2.7 km north-east), Shieldmuir (2.8 km south-east), Carfin (3.0 km north-east) and Chatelherault (3.0 km south). 26 stations lie within 10 km in all. At 80.2%, Motherwell is less punctual than all of them; the best of the five, Airbles, manages 94.0%.
Motherwell is one of 2 stations named after a town called Motherwell, home to about 32,590 people; this one stands 0.3 km from its centre.
6 operators call at Motherwell: ScotRail (83.7%, 81% of stops), Avanti (57.9%, 9% of stops), TransPennine Express (67.7%, 7% of stops), CrossCountry (74.4%, 2% of stops) and Lumo (West Coast) (62.1%, 1% of stops). The operator you travel with matters: ScotRail reaches 83.7% within three minutes while Avanti manages 57.9%, a gap of 25.8 percentage points.
Compared with 3 stations of a similar size in Scotland, Motherwell is the least punctual, at 80.2%. All of them are ahead, including Stirling (89.4%), Westerton (86.3%) and Anniesland (88.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 69,206 | 83.7% | 1.6% |
| Avanti | 7,258 | 57.9% | 5.4% |
| TransPennine Express | 5,587 | 67.7% | 6.3% |
| CrossCountry | 1,600 | 74.4% | 8.2% |
| Lumo (West Coast) | 721 | 62.1% | 5.1% |
| Caledonian Sleeper | 588 | – | – |
Operators with their own page for this station are linked to it.
Late train at Motherwell? Delay Repay
These operators call at Motherwell and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Avanti: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- TransPennine Express: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Lumo (West Coast): pays for a delay of 30 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,741 | 78.2% | 2.3% |
| Period 6 of 2026-27 | 6,829 | 80.0% | 1.3% |
| Period 5 of 2026-27 | 6,822 | 78.7% | 2.1% |
| Period 4 of 2026-27 | 6,664 | 79.8% | 3.1% |
| Period 3 of 2026-27 | 6,548 | 82.3% | 1.4% |
| Period 2 of 2026-27 | 6,278 | 81.6% | 1.9% |
| Period 1 of 2026-27 | 6,804 | 83.1% | 1.7% |
| Period 13 of 2025-26 | 6,234 | 82.7% | 2.9% |
| Period 12 of 2025-26 | 6,666 | 82.7% | 2.6% |
| Period 11 of 2025-26 | 6,555 | 85.0% | 1.5% |
| Period 10 of 2025-26 | 5,610 | 77.4% | 4.0% |
| Period 9 of 2025-26 | 6,639 | 73.9% | 3.6% |
| Period 8 of 2025-26 | 6,570 | 76.2% | 2.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stirling | 80,099 | 89.4% | 1.3% |
| Westerton | 77,290 | 86.3% | 2.1% |
| Anniesland | 94,188 | 88.1% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out