Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Stirling

All trains at StirlingLNER across BritainScotland

On time, last 13 periods54.0%Whole station: 89.4%
Cancelled0.3%Whole station: 1.3%
Scheduled stops711Of 80,099 at the station

How this operator is doing here

LNER had 711 scheduled stops at Stirling in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 54.0% of recorded arrivals came within three minutes and 0.3% of stops were cancelled.

LNER trains at Stirling also serve Dunblane (7.6 km north, – on time, – cancelled), Falkirk Grahamston (16.0 km south-east, 50.3% on time, 0.3% cancelled), Gleneagles (21.4 km north-east, 54.0% on time, 0.3% cancelled), Inverkeithing (34.7 km east, 55.4% on time, 1.6% cancelled), Perth (43.0 km north-east, 60.5% on time, 0.4% cancelled) and Kirkcaldy (47.6 km east, 61.6% on time, 1.7% cancelled), which are the stations on its network closest to Stirling.

The busiest LNER station within 30 km of Stirling is Falkirk Grahamston, 16.0 km south-east, with about 2 scheduled stops a day.

Of the 3 operators with enough records at Stirling, LNER is the least punctual, at 54.0%.

LNER cancels fewer trains at Stirling than elsewhere: 0.3% of scheduled stops, against 2.9% across its network and 1.3% for every operator at the station.

LNER at Stirling has slipped sharply. 54.0% of stops came within three minutes of the timetable in the latest 13 periods, 15.3 percentage points worse than the 69.3% recorded in the 13 before. Cancellations fell to 0.3% of scheduled stops from 2.1%, which is 1.8 percentage points fewer.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 79.3%Period 2 of 2023-24: 85.7%Period 3 of 2023-24: 63.4%Period 4 of 2023-24: 77.9%Period 5 of 2023-24: 66.7%Period 6 of 2023-24: 73.0%Period 7 of 2023-24: 68.1%Period 8 of 2023-24: 59.7%Period 9 of 2023-24: 66.7%Period 10 of 2023-24: 75.0%Period 11 of 2023-24: 64.4%Period 13 of 2023-24: 80.2%Period 1 of 2024-25: 83.3%Period 2 of 2024-25: 65.0%Period 3 of 2024-25: 70.6%Period 4 of 2024-25: 87.8%Period 5 of 2024-25: 73.3%Period 6 of 2024-25: 70.3%Period 7 of 2024-25: 66.7%Period 8 of 2024-25: 75.3%Period 9 of 2024-25: 68.8%Period 12 of 2024-25: 80.4%Period 13 of 2024-25: 78.3%Period 2 of 2025-26: 62.5%Period 3 of 2025-26: 67.9%Period 4 of 2025-26: 51.8%Period 7 of 2025-26: 64.7%Period 8 of 2025-26: 64.3%Period 13 of 2025-26: 58.9%Period 1 of 2026-27: 53.2%Period 2 of 2026-27: 50.0%Period 3 of 2026-27: 58.9%Period 4 of 2026-27: 39.3%Period 7 of 2026-27: 53.6%
This pageGreat Britain
0%5%10%15%Period 1 of 2023-24: 7.9%Period 2 of 2023-24: 7.2%Period 3 of 2023-24: 1.4%Period 4 of 2023-24: 0.0%Period 5 of 2023-24: 0.0%Period 6 of 2023-24: 5.1%Period 7 of 2023-24: 6.5%Period 8 of 2023-24: 14.3%Period 9 of 2023-24: 6.9%Period 10 of 2023-24: 11.1%Period 11 of 2023-24: 6.3%Period 13 of 2023-24: 6.2%Period 1 of 2024-25: 13.3%Period 2 of 2024-25: 2.4%Period 3 of 2024-25: 5.6%Period 4 of 2024-25: 9.9%Period 5 of 2024-25: 4.3%Period 6 of 2024-25: 0.0%Period 7 of 2024-25: 5.4%Period 8 of 2024-25: 3.1%Period 9 of 2024-25: 3.1%Period 12 of 2024-25: 0.0%Period 13 of 2024-25: 0.0%Period 2 of 2025-26: 0.0%Period 3 of 2025-26: 0.0%Period 4 of 2025-26: 0.0%Period 7 of 2025-26: 8.9%Period 8 of 2025-26: 0.0%Period 13 of 2025-26: 0.0%Period 1 of 2026-27: 1.6%Period 2 of 2026-27: 0.0%Period 3 of 2026-27: 0.0%Period 4 of 2026-27: 0.0%Period 7 of 2026-27: 0.0%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

Time of year

60%70%80%90%P1: 73.1%1P2: 67.3%2P3: 65.7%3P4: 67.9%4P5: 70.0%5P6: 71.5%6P7: 63.9%7P8: 67.4%8P9: 67.8%9101112P13: 73.9%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Stirling

OperatorScheduled stopsWithin 3 minCancelled
ScotRail77,98390.0%1.2%
Lumo (West Coast)79773.5%6.6%
Caledonian Sleeper608––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out