ScotRail at Stirling
How this operator is doing here
ScotRail had 77,983 scheduled stops at Stirling in the 13 periods to Period 7 of 2026-27, 97% of the station's total. 90.0% of recorded arrivals came within three minutes and 1.2% of stops were cancelled.
ScotRail trains at Stirling also serve Bridge of Allan (4.4 km north, – on time, 1.4% cancelled), Dunblane (7.6 km north, 91.5% on time, 1.5% cancelled), Alloa (9.1 km east, 95.6% on time, 1.4% cancelled), Larbert (12.6 km south-east, 92.7% on time, 0.8% cancelled), Camelon (14.5 km south-east, 93.8% on time, 0.9% cancelled) and Falkirk Grahamston (16.0 km south-east, 91.2% on time, 0.9% cancelled), which are the stations on its network closest to Stirling.
Within 30 km of here, ScotRail runs best at Alloa, 9.1 km east (95.6%), and worst at Airdrie, 28.6 km south (86.1%).
The busiest ScotRail station within 30 km of Stirling is Linlithgow, 26.4 km south-east, with about 147 scheduled stops a day.
Of the 3 operators with enough records at Stirling, ScotRail is the most punctual, at 90.0%.
For ScotRail, Stirling is the 110th best of 312 ranked stations. Its 90.0% here is 2.1 percentage points above the 87.9% across the whole network.
Over three full railway years ScotRail at Stirling has got worse each time, from 91.6% within three minutes in 2023-24 to 91.0% in 2024-25 and 90.2% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,000 | 89.7% | 0.7% |
| Period 6 of 2026-27 | 5,929 | 91.4% | 1.6% |
| Period 5 of 2026-27 | 6,001 | 89.6% | 1.3% |
| Period 4 of 2026-27 | 6,071 | 90.3% | 1.9% |
| Period 3 of 2026-27 | 6,001 | 91.0% | 1.6% |
| Period 2 of 2026-27 | 5,996 | 93.2% | 1.2% |
| Period 1 of 2026-27 | 6,957 | 90.6% | 0.9% |
| Period 13 of 2025-26 | 6,415 | 91.5% | 1.4% |
| Period 12 of 2025-26 | 5,707 | 91.8% | 0.8% |
| Period 11 of 2025-26 | 6,000 | 87.2% | 1.1% |
| Period 10 of 2025-26 | 5,162 | 89.3% | 0.7% |
| Period 9 of 2025-26 | 5,872 | 88.2% | 1.1% |
| Period 8 of 2025-26 | 5,872 | 86.0% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Stirling
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Lumo (West Coast) | 797 | 73.5% | 6.6% |
| LNER | 711 | 54.0% | 0.3% |
| Caledonian Sleeper | 608 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out