Cambuslang
CBLScotlandManaged by ScotRail
How this station is performing
Cambuslang had 74,200 scheduled stops to Period 7 of 2026-27, about 204 a day. 84.9% of recorded arrivals were within three minutes of the timetable and 1.6% of scheduled stops were cancelled.
Cambuslang opened on 1 June 1849, 177 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cambuslang is the oldest; the next oldest, Rutherglen, dates from 1849.
The nearest stations to Cambuslang are Kirkhill (0.6 km south-east), Carmyle (1.9 km north-east), Burnside (South Lanarkshire) (1.9 km west), Newton (Lanark) (2.5 km east) and Rutherglen (2.8 km north-west). 65 stations lie within 10 km in all. Of the five, Burnside (South Lanarkshire) is the most punctual at 94.0% and Carmyle the least at 70.9%, with Cambuslang on 84.9%.
Cambuslang takes its name from a town called Cambuslang, home to about 29,100 people, and the station stands 1.3 km from its centre.
The time of year matters a great deal for Cambuslang. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 79.6%, while period 13 (March) is the strongest at 91.2%, a spread of 11.6 percentage points.
Compared with 3 stations of a similar size in Scotland, Cambuslang is the least punctual, at 84.9%. All of them are ahead, including High Street (Glasgow) (87.5%), Charing Cross (Glasgow) (87.2%) and Newton (Lanark) (88.7%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 74,200 | 84.9% | 1.6% |
Operators with their own page for this station are linked to it.
Late train at Cambuslang? Delay Repay
These operators call at Cambuslang and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,782 | 81.9% | 2.4% |
| Period 6 of 2026-27 | 5,786 | 85.4% | 0.9% |
| Period 5 of 2026-27 | 5,786 | 84.8% | 1.4% |
| Period 4 of 2026-27 | 5,636 | 87.0% | 2.3% |
| Period 3 of 2026-27 | 5,604 | 86.2% | 1.2% |
| Period 2 of 2026-27 | 5,508 | 86.5% | 1.0% |
| Period 1 of 2026-27 | 6,418 | 87.3% | 1.4% |
| Period 13 of 2025-26 | 5,417 | 90.0% | 1.4% |
| Period 12 of 2025-26 | 5,786 | 86.0% | 1.5% |
| Period 11 of 2025-26 | 5,785 | 88.0% | 1.1% |
| Period 10 of 2025-26 | 5,112 | 81.2% | 2.2% |
| Period 9 of 2025-26 | 5,796 | 79.4% | 2.4% |
| Period 8 of 2025-26 | 5,784 | 79.1% | 2.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| High Street (Glasgow) | 73,869 | 87.5% | 1.7% |
| Charing Cross (Glasgow) | 73,867 | 87.2% | 1.5% |
| Newton (Lanark) | 72,038 | 88.7% | 2.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out