ScotRail at Motherwell
How this operator is doing here
ScotRail had 69,206 scheduled stops at Motherwell in the 13 periods to Period 7 of 2026-27, 81% of the station's total. 83.7% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
ScotRail trains at Motherwell also serve Airbles (1.1 km south, 94.0% on time, 2.0% cancelled), Holytown (2.7 km north-east, 86.5% on time, 1.5% cancelled), Shieldmuir (2.8 km south-east, 85.7% on time, 1.6% cancelled), Carfin (3.0 km north-east, 87.0% on time, 1.5% cancelled), Chatelherault (3.0 km south, 81.3% on time, 2.8% cancelled) and Bellshill (3.3 km north-west, 87.2% on time, 1.6% cancelled), which are the stations on its network closest to Motherwell.
Within 30 km of here, ScotRail runs best at Neilston, 27.0 km west (97.6%), and worst at Bargeddie, 8.2 km north-west (69.7%).
The busiest ScotRail station within 30 km of Motherwell is Glasgow Central, 18.0 km north-west, with about 995 scheduled stops a day.
Of the 5 operators with enough records at Motherwell, ScotRail is the most punctual, at 83.7%.
For ScotRail, Motherwell is the 227th best of 312 ranked stations. Its 83.7% here is 4.2 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Motherwell has got worse each time, from 88.7% within three minutes in 2023-24 to 86.9% in 2024-25 and 84.8% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,343 | 82.1% | 1.9% |
| Period 6 of 2026-27 | 5,422 | 84.6% | 0.9% |
| Period 5 of 2026-27 | 5,392 | 83.1% | 1.2% |
| Period 4 of 2026-27 | 5,301 | 84.4% | 2.2% |
| Period 3 of 2026-27 | 5,298 | 85.9% | 0.8% |
| Period 2 of 2026-27 | 5,252 | 85.0% | 1.4% |
| Period 1 of 2026-27 | 5,902 | 85.5% | 1.3% |
| Period 13 of 2025-26 | 5,104 | 86.5% | 1.4% |
| Period 12 of 2025-26 | 5,422 | 85.7% | 1.8% |
| Period 11 of 2025-26 | 5,421 | 86.7% | 1.2% |
| Period 10 of 2025-26 | 4,541 | 81.0% | 2.6% |
| Period 9 of 2025-26 | 5,409 | 78.1% | 2.3% |
| Period 8 of 2025-26 | 5,399 | 78.9% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Motherwell
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Avanti | 7,258 | 57.9% | 5.4% |
| TransPennine Express | 5,587 | 67.7% | 6.3% |
| CrossCountry | 1,600 | 74.4% | 8.2% |
| Lumo (West Coast) | 721 | 62.1% | 5.1% |
| Caledonian Sleeper | 588 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out