Lumo (West Coast) at Motherwell
All trains at MotherwellLumo (West Coast) across BritainScotland
How this operator is doing here
Lumo (West Coast) had 721 scheduled stops at Motherwell in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 62.1% of recorded arrivals came within three minutes and 5.1% of stops were cancelled.
Lumo (West Coast) trains at Motherwell also serve Whifflet (7.0 km north, 67.2% on time, 6.6% cancelled), Greenfaulds (15.9 km north, 58.5% on time, 6.6% cancelled), Larbert (27.6 km north, 72.1% on time, 6.6% cancelled), Stirling (36.6 km north, 73.5% on time, 6.6% cancelled), Lockerbie (84.7 km south-east, 50.3% on time, 5.0% cancelled) and Carlisle (120.7 km south-east, 55.4% on time, 4.7% cancelled), which are the stations on its network closest to Motherwell.
The busiest Lumo (West Coast) station within 30 km of Motherwell is Whifflet, 7.0 km north, with about 2 scheduled stops a day.
Lumo (West Coast) ranks 4th of the 5 operators with enough records at Motherwell, on 62.1%.
Cancellations of Lumo (West Coast) at Motherwell are near its usual level: 5.1% of scheduled stops, against 5.1% across its network and 2.4% for every operator at the station.
Alongside Lumo (West Coast), the other operators at Motherwell are ScotRail (83.7%, 81% of stops), Avanti (57.9%, 9% of stops), TransPennine Express (67.7%, 7% of stops) and CrossCountry (74.4%, 2% of stops), so passengers here can compare several services.
Period by period
See how Lumo (West Coast) Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 166 | 65.6% | 5.4% |
| Period 6 of 2026-27 | 177 | 59.9% | 2.8% |
| Period 5 of 2026-27 | 186 | 64.1% | 8.6% |
| Period 4 of 2026-27 | 122 | 59.7% | 2.5% |
| Period 3 of 2026-27 | 60 | 57.9% | 5.0% |
| Period 2 of 2026-27 | 10 | – | – |
| Period 1 of 2026-27 | 0 | – | – |
| Period 13 of 2025-26 | 0 | – | – |
| Period 12 of 2025-26 | 0 | – | – |
| Period 11 of 2025-26 | 0 | – | – |
| Period 10 of 2025-26 | 0 | – | – |
| Period 9 of 2025-26 | 0 | – | – |
| Period 8 of 2025-26 | 0 | – | – |
Other operators at Motherwell
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 69,206 | 83.7% | 1.6% |
| Avanti | 7,258 | 57.9% | 5.4% |
| TransPennine Express | 5,587 | 67.7% | 6.3% |
| CrossCountry | 1,600 | 74.4% | 8.2% |
| Caledonian Sleeper | 588 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out