CrossCountry at Motherwell
How this operator is doing here
CrossCountry had 1,600 scheduled stops at Motherwell in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 74.4% of recorded arrivals came within three minutes and 8.2% of stops were cancelled.
CrossCountry trains at Motherwell also serve Glasgow Central (18.0 km north-west, 77.2% on time, 8.2% cancelled), Inverkeithing (46.1 km north-east, 46.9% on time, 13.6% cancelled), Haymarket (51.3 km east, 65.0% on time, 11.4% cancelled), Edinburgh (53.3 km east, 70.3% on time, 4.2% cancelled), Kirkcaldy (62.7 km north-east, 48.0% on time, 13.6% cancelled) and Markinch (70.4 km north-east, 47.1% on time, 13.6% cancelled), which are the stations on its network closest to Motherwell.
The busiest CrossCountry station within 30 km of Motherwell is Glasgow Central, 18.0 km north-west, with about 4 scheduled stops a day.
CrossCountry ranks 2nd of the 5 operators with enough records at Motherwell, on 74.4%.
For CrossCountry, Motherwell is the 13th best of 99 ranked stations. Its 74.4% here is 11.2 percentage points above the 63.2% across the whole network.
CrossCountry at Motherwell has slipped a little, from 78.5% within three minutes in the previous 13 periods to 74.4% in the latest 13, a fall of 4.1 percentage points. Cancellations fell to 8.2% of scheduled stops from 10.1%, which is 1.9 percentage points fewer.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 132 | 71.1% | 3.0% |
| Period 6 of 2026-27 | 129 | 77.1% | 8.5% |
| Period 5 of 2026-27 | 132 | 69.5% | 3.0% |
| Period 4 of 2026-27 | 132 | 69.4% | 8.3% |
| Period 3 of 2026-27 | 129 | 76.0% | 6.2% |
| Period 2 of 2026-27 | 113 | 76.0% | 8.0% |
| Period 1 of 2026-27 | 118 | 67.6% | 11.0% |
| Period 13 of 2025-26 | 79 | 75.9% | 25.3% |
| Period 12 of 2025-26 | 132 | 78.6% | 4.5% |
| Period 11 of 2025-26 | 132 | 79.2% | 5.3% |
| Period 10 of 2025-26 | 113 | 70.6% | 9.7% |
| Period 9 of 2025-26 | 132 | 75.7% | 12.9% |
| Period 8 of 2025-26 | 127 | 80.2% | 8.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Motherwell
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 69,206 | 83.7% | 1.6% |
| Avanti | 7,258 | 57.9% | 5.4% |
| TransPennine Express | 5,587 | 67.7% | 6.3% |
| Lumo (West Coast) | 721 | 62.1% | 5.1% |
| Caledonian Sleeper | 588 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out