LNER at Inverkeithing
How this operator is doing here
LNER had 2,626 scheduled stops at Inverkeithing in the 13 periods to Period 7 of 2026-27, 4% of the station's total. 55.4% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
LNER trains at Inverkeithing also serve Haymarket (14.8 km south-east, 51.2% on time, 1.3% cancelled), Edinburgh (15.8 km south-east, 72.5% on time, 2.4% cancelled), Kirkcaldy (16.5 km north-east, 61.6% on time, 1.7% cancelled), Falkirk Grahamston (24.5 km west, 50.3% on time, 0.3% cancelled), Gleneagles (33.8 km north-west, 54.0% on time, 0.3% cancelled) and Stirling (34.7 km west, 54.0% on time, 0.3% cancelled), which are the stations on its network closest to Inverkeithing.
The busiest LNER station within 30 km of Inverkeithing is Edinburgh, 15.8 km south-east, with about 61 scheduled stops a day.
LNER ranks 2nd of the 3 operators with enough records at Inverkeithing, on 55.4%.
For LNER, Inverkeithing is the 34th best of 35 ranked stations. Its 55.4% here is 12.2 percentage points below the 67.6% across the whole network.
LNER at Inverkeithing has slipped sharply. 55.4% of stops came within three minutes of the timetable in the latest 13 periods, 18.3 percentage points worse than the 73.7% recorded in the 13 before. Cancellations rose to 1.6% of scheduled stops from 0.6%, which is 1.0 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 208 | 52.4% | 1.0% |
| Period 6 of 2026-27 | 208 | 55.9% | 1.9% |
| Period 5 of 2026-27 | 208 | 45.9% | 1.4% |
| Period 4 of 2026-27 | 208 | 44.0% | 0.0% |
| Period 3 of 2026-27 | 208 | 50.5% | 1.9% |
| Period 2 of 2026-27 | 206 | 58.7% | 0.0% |
| Period 1 of 2026-27 | 235 | 49.8% | 1.7% |
| Period 13 of 2025-26 | 228 | 64.2% | 0.9% |
| Period 12 of 2025-26 | 194 | 58.9% | 2.1% |
| Period 11 of 2025-26 | 127 | 47.0% | 7.9% |
| Period 10 of 2025-26 | 180 | 53.1% | 1.7% |
| Period 9 of 2025-26 | 208 | 64.9% | 1.4% |
| Period 8 of 2025-26 | 208 | 71.1% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Inverkeithing
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 61,249 | 81.7% | 1.4% |
| CrossCountry | 692 | 46.9% | 13.6% |
| Caledonian Sleeper | 45 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out