Anderston
ANDScotlandManaged by ScotRail
How this station is performing
Anderston had 68,522 scheduled stops to Period 7 of 2026-27, about 188 a day. 84.2% of recorded arrivals were within three minutes of the timetable and 1.8% of scheduled stops were cancelled.
Anderston opened on 10 August 1896 and closed to passengers on 3 August 1959. It reopened on 5 November 1979, 47 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Glasgow Queen Street is the oldest (1842) and Argyle Street the newest (1979), with Anderston in between.
The nearest stations to Anderston are Charing Cross (Glasgow) (0.5 km north), Glasgow Central (0.8 km east), Exhibition Centre (Glasgow) (0.8 km west), Glasgow Queen Street (1.2 km east) and Argyle Street (1.3 km east). 83 stations lie within 10 km in all. At 84.2%, Anderston is less punctual than all of them; the best of the five, Glasgow Central, manages 87.8%.
Anderston takes its name from a suburb called Anderston, and the station stands 0.7 km from its centre.
Anderston has slipped a little, from 87.9% within three minutes in the previous 13 periods to 84.2% in the latest 13, a fall of 3.7 percentage points. Cancellations fell to 1.8% of scheduled stops from 2.7%, which is 0.9 percentage points fewer.
Compared with 3 stations of a similar size in Scotland, Anderston is the least punctual, at 84.2%. All of them are ahead, including Argyle Street (84.8%), Bellgrove (87.9%) and Dalmarnock (86.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 68,522 | 84.2% | 1.8% |
Operators with their own page for this station are linked to it.
Late train at Anderston? Delay Repay
These operators call at Anderston and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,217 | 78.9% | 3.0% |
| Period 6 of 2026-27 | 5,234 | 84.6% | 1.0% |
| Period 5 of 2026-27 | 5,241 | 85.0% | 1.4% |
| Period 4 of 2026-27 | 5,191 | 86.0% | 3.7% |
| Period 3 of 2026-27 | 5,232 | 86.2% | 1.1% |
| Period 2 of 2026-27 | 5,220 | 84.8% | 1.1% |
| Period 1 of 2026-27 | 6,030 | 85.5% | 1.5% |
| Period 13 of 2025-26 | 5,681 | 86.2% | 1.1% |
| Period 12 of 2025-26 | 5,217 | 88.1% | 1.5% |
| Period 11 of 2025-26 | 5,209 | 87.8% | 1.3% |
| Period 10 of 2025-26 | 4,662 | 84.7% | 1.8% |
| Period 9 of 2025-26 | 5,200 | 79.6% | 2.7% |
| Period 8 of 2025-26 | 5,188 | 76.1% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Argyle Street | 68,541 | 84.8% | 1.6% |
| Bellgrove | 68,922 | 87.9% | 1.7% |
| Dalmarnock | 70,076 | 86.2% | 1.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out