On time, last 13 periods46.9%Whole station: 80.3%
Cancelled13.6%Whole station: 1.5%
Scheduled stops692Of 64,612 at the station

How this operator is doing here

CrossCountry had 692 scheduled stops at Inverkeithing in the 13 periods to Period 7 of 2026-27, 1% of the station's total. 46.9% of recorded arrivals came within three minutes and 13.6% of stops were cancelled.

CrossCountry trains at Inverkeithing also serve Haymarket (14.8 km south-east, 65.0% on time, 11.4% cancelled), Edinburgh (15.8 km south-east, 70.3% on time, 4.2% cancelled), Kirkcaldy (16.5 km north-east, 48.0% on time, 13.6% cancelled), Markinch (24.6 km north-east, 47.1% on time, 13.6% cancelled), Ladybank (31.5 km north-east, 49.4% on time, 13.6% cancelled) and Cupar (39.4 km north-east, 51.2% on time, 13.6% cancelled), which are the stations on its network closest to Inverkeithing.

The busiest CrossCountry station within 30 km of Inverkeithing is Edinburgh, 15.8 km south-east, with about 29 scheduled stops a day.

Of the 3 operators with enough records at Inverkeithing, CrossCountry is the least punctual, at 46.9%.

CrossCountry cancels more at Inverkeithing than elsewhere: 13.6% of scheduled stops, against 5.9% across its network and 1.5% for every operator at the station.

CrossCountry at Inverkeithing has slipped sharply. 46.9% of stops came within three minutes of the timetable in the latest 13 periods, 27.7 percentage points worse than the 74.6% recorded in the 13 before. Cancellations rose to 13.6% of scheduled stops from 9.6%, which is 4.0 percentage points more.

Period by period

40%60%80%2023-242024-252025-262026-27Period 13 of 2023-24: 64.3%Period 3 of 2024-25: 58.8%Period 4 of 2024-25: 51.0%Period 9 of 2024-25: 64.4%Period 12 of 2024-25: 87.0%Period 13 of 2024-25: 83.0%Period 2 of 2025-26: 73.6%Period 3 of 2025-26: 73.1%Period 4 of 2025-26: 62.7%Period 7 of 2025-26: 76.5%Period 9 of 2025-26: 38.5%Period 12 of 2025-26: 53.8%Period 13 of 2025-26: 56.9%Period 1 of 2026-27: 50.0%Period 2 of 2026-27: 55.8%Period 4 of 2026-27: 38.0%Period 5 of 2026-27: 32.7%Period 6 of 2026-27: 50.0%
This pageGreat Britain
0%10%20%30%Period 13 of 2023-24: 3.4%Period 3 of 2024-25: 8.9%Period 4 of 2024-25: 12.5%Period 9 of 2024-25: 19.6%Period 12 of 2024-25: 3.6%Period 13 of 2024-25: 11.7%Period 2 of 2025-26: 5.4%Period 3 of 2025-26: 7.1%Period 4 of 2025-26: 8.9%Period 7 of 2025-26: 10.5%Period 9 of 2025-26: 7.1%Period 12 of 2025-26: 7.1%Period 13 of 2025-26: 6.5%Period 1 of 2026-27: 28.1%Period 2 of 2026-27: 23.2%Period 4 of 2026-27: 10.7%Period 5 of 2026-27: 7.1%Period 6 of 2026-27: 17.9%2023-242024-252025-262026-27

See how CrossCountry Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-2740––
Period 6 of 2026-275650.0%17.9%
Period 5 of 2026-275632.7%7.1%
Period 4 of 2026-275638.0%10.7%
Period 3 of 2026-2750––
Period 2 of 2026-275655.8%23.2%
Period 1 of 2026-276450.0%28.1%
Period 13 of 2025-266256.9%6.5%
Period 12 of 2025-265653.8%7.1%
Period 11 of 2025-2638––
Period 10 of 2025-2648––
Period 9 of 2025-265638.5%7.1%
Period 8 of 2025-2654––

Other operators at Inverkeithing

OperatorScheduled stopsWithin 3 minCancelled
ScotRail61,24981.7%1.4%
LNER2,62655.4%1.6%
Caledonian Sleeper45––