ScotRail at Inverkeithing
How this operator is doing here
ScotRail had 61,249 scheduled stops at Inverkeithing in the 13 periods to Period 7 of 2026-27, 95% of the station's total. 81.7% of recorded arrivals came within three minutes and 1.4% of stops were cancelled.
ScotRail trains at Inverkeithing also serve Dalgety Bay (1.9 km north-east, 79.2% on time, 1.7% cancelled), Rosyth (2.2 km north-west, 85.7% on time, 1.6% cancelled), North Queensferry (2.5 km south, 82.9% on time, 1.6% cancelled), Dunfermline City (5.1 km north-west, 87.2% on time, 1.6% cancelled), Dunfermline Queen Margaret (5.3 km north, 86.1% on time, 1.6% cancelled) and Dalmeny (5.5 km south, 81.0% on time, 1.6% cancelled), which are the stations on its network closest to Inverkeithing.
Within 30 km of here, ScotRail runs best at Alloa, 26.1 km west (95.6%), and worst at Kinghorn, 14.3 km east (77.6%).
The busiest ScotRail station within 30 km of Inverkeithing is Edinburgh, 15.8 km south-east, with about 614 scheduled stops a day.
Of the 3 operators with enough records at Inverkeithing, ScotRail is the most punctual, at 81.7%.
ScotRail at Inverkeithing has slipped a little, from 85.1% within three minutes in the previous 13 periods to 81.7% in the latest 13, a fall of 3.4 percentage points. Cancellations held steady at 1.4% of scheduled stops, against 1.7% before.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,239 | 77.6% | 1.1% |
| Period 6 of 2026-27 | 4,746 | 81.6% | 1.8% |
| Period 5 of 2026-27 | 4,751 | 77.2% | 1.6% |
| Period 4 of 2026-27 | 4,744 | 79.3% | 1.6% |
| Period 3 of 2026-27 | 4,742 | 84.3% | 1.3% |
| Period 2 of 2026-27 | 4,738 | 85.1% | 1.1% |
| Period 1 of 2026-27 | 5,471 | 84.6% | 1.4% |
| Period 13 of 2025-26 | 5,185 | 86.6% | 1.0% |
| Period 12 of 2025-26 | 4,736 | 84.1% | 1.1% |
| Period 11 of 2025-26 | 4,454 | 84.9% | 1.5% |
| Period 10 of 2025-26 | 4,094 | 80.7% | 1.1% |
| Period 9 of 2025-26 | 4,676 | 76.5% | 2.6% |
| Period 8 of 2025-26 | 4,673 | 78.3% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Inverkeithing
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,626 | 55.4% | 1.6% |
| CrossCountry | 692 | 46.9% | 13.6% |
| Caledonian Sleeper | 45 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out