ScotRail at Haymarket
How this operator is doing here
ScotRail had 184,685 scheduled stops at Haymarket in the 13 periods to Period 7 of 2026-27, 92% of the station's total. 86.7% of recorded arrivals came within three minutes and 1.4% of stops were cancelled.
ScotRail trains at Haymarket also serve Edinburgh (2.0 km north-east, 87.6% on time, 1.3% cancelled), Slateford (2.5 km south-west, 86.8% on time, 1.3% cancelled), Kingsknowe (4.1 km south-west, 80.8% on time, 1.3% cancelled), South Gyle (5.1 km west, 82.3% on time, 1.4% cancelled), Wester Hailes (5.3 km south-west, 83.2% on time, 1.3% cancelled) and Edinburgh Park (5.8 km west, 90.2% on time, 1.8% cancelled), which are the stations on its network closest to Haymarket.
Within 30 km of here, ScotRail runs best at Linlithgow, 23.7 km west (92.4%), and worst at Kinghorn, 14.1 km north (77.6%).
The busiest ScotRail station within 30 km of Haymarket is Edinburgh, 2.0 km north-east, with about 614 scheduled stops a day.
Of the 6 operators with enough records at Haymarket, ScotRail is the most punctual, at 86.7%.
For ScotRail, Haymarket is the 184th best of 312 ranked stations. Its 86.7% here is 1.2 percentage points below the 87.9% across the whole network.
Cancellations of ScotRail at Haymarket are near its usual level: 1.4% of scheduled stops, against 1.6% across its network and 1.7% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 13,841 | 85.2% | 0.9% |
| Period 6 of 2026-27 | 14,304 | 87.4% | 1.7% |
| Period 5 of 2026-27 | 14,418 | 85.0% | 1.3% |
| Period 4 of 2026-27 | 14,259 | 85.6% | 2.4% |
| Period 3 of 2026-27 | 14,370 | 87.8% | 1.3% |
| Period 2 of 2026-27 | 14,283 | 87.8% | 1.4% |
| Period 1 of 2026-27 | 16,469 | 89.2% | 1.3% |
| Period 13 of 2025-26 | 14,796 | 90.5% | 1.4% |
| Period 12 of 2025-26 | 14,315 | 89.1% | 1.2% |
| Period 11 of 2025-26 | 12,879 | 86.6% | 1.0% |
| Period 10 of 2025-26 | 12,438 | 86.4% | 1.1% |
| Period 9 of 2025-26 | 14,158 | 82.4% | 2.0% |
| Period 8 of 2025-26 | 14,155 | 83.2% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Haymarket
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| TransPennine Express | 5,216 | 71.8% | 3.7% |
| Avanti | 4,677 | 66.1% | 4.5% |
| LNER | 3,417 | 51.2% | 1.3% |
| CrossCountry | 2,409 | 65.0% | 11.4% |
| Lumo (East Coast) | 687 | 80.6% | 17.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out