Avanti at Haymarket
How this operator is doing here
Avanti had 4,677 scheduled stops at Haymarket in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 66.1% of recorded arrivals came within three minutes and 4.5% of stops were cancelled.
Avanti trains at Haymarket also serve Edinburgh (2.0 km north-east, 66.3% on time, 4.4% cancelled), Shieldmuir (49.7 km west, – on time, – cancelled), Motherwell (51.3 km west, 57.9% on time, 5.4% cancelled), Glasgow Central (65.5 km west, 64.7% on time, 5.5% cancelled), Lockerbie (91.9 km south, 53.1% on time, 5.0% cancelled) and Carlisle (118.7 km south, 51.7% on time, 4.6% cancelled), which are the stations on its network closest to Haymarket.
The busiest Avanti station within 30 km of Haymarket is Edinburgh, 2.0 km north-east, with about 13 scheduled stops a day.
Avanti ranks 4th of the 6 operators with enough records at Haymarket, on 66.1%.
Avanti at Haymarket has slipped a little, from 70.8% within three minutes in the previous 13 periods to 66.1% in the latest 13, a fall of 4.7 percentage points. Cancellations rose to 4.5% of scheduled stops from 3.5%, which is 1.0 percentage points more.
Over three full railway years Avanti at Haymarket has got worse each time, from 74.6% within three minutes in 2023-24 to 73.5% in 2024-25 and 68.3% in 2025-26.
Period by period
See how Avanti Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 376 | 67.1% | 1.3% |
| Period 6 of 2026-27 | 376 | 61.2% | 0.5% |
| Period 5 of 2026-27 | 376 | 63.1% | 6.9% |
| Period 4 of 2026-27 | 376 | 52.3% | 12.0% |
| Period 3 of 2026-27 | 370 | 64.2% | 4.1% |
| Period 2 of 2026-27 | 365 | 67.2% | 3.0% |
| Period 1 of 2026-27 | 276 | 71.9% | 0.7% |
| Period 13 of 2025-26 | 461 | 78.6% | 3.9% |
| Period 12 of 2025-26 | 376 | 69.7% | 2.7% |
| Period 11 of 2025-26 | 268 | 72.9% | 2.2% |
| Period 10 of 2025-26 | 321 | 70.9% | 6.9% |
| Period 9 of 2025-26 | 376 | 57.5% | 7.4% |
| Period 8 of 2025-26 | 360 | 62.1% | 5.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Haymarket
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 184,685 | 86.7% | 1.4% |
| TransPennine Express | 5,216 | 71.8% | 3.7% |
| LNER | 3,417 | 51.2% | 1.3% |
| CrossCountry | 2,409 | 65.0% | 11.4% |
| Lumo (East Coast) | 687 | 80.6% | 17.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out