LNER at Haymarket
How this operator is doing here
LNER had 3,417 scheduled stops at Haymarket in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 51.2% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
LNER trains at Haymarket also serve Edinburgh (2.0 km north-east, 72.5% on time, 2.4% cancelled), Inverkeithing (14.8 km north-west, 55.4% on time, 1.6% cancelled), Kirkcaldy (18.8 km north, 61.6% on time, 1.7% cancelled), Falkirk Grahamston (35.8 km west, 50.3% on time, 0.3% cancelled), Dunbar (44.3 km east, 75.9% on time, 1.4% cancelled) and Stirling (48.5 km north-west, 54.0% on time, 0.3% cancelled), which are the stations on its network closest to Haymarket.
The busiest LNER station within 30 km of Haymarket is Edinburgh, 2.0 km north-east, with about 61 scheduled stops a day.
Of the 6 operators with enough records at Haymarket, LNER is the least punctual, at 51.2%.
LNER at Haymarket has slipped sharply. 51.2% of stops came within three minutes of the timetable in the latest 13 periods, 17.9 percentage points worse than the 69.1% recorded in the 13 before. Cancellations held steady at 1.3% of scheduled stops, against 0.9% before.
Over three full railway years LNER at Haymarket has got worse each time, from 72.9% within three minutes in 2023-24 to 69.1% in 2024-25 and 63.1% in 2025-26.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 263 | 46.4% | 0.8% |
| Period 6 of 2026-27 | 263 | 52.1% | 1.5% |
| Period 5 of 2026-27 | 263 | 39.2% | 1.1% |
| Period 4 of 2026-27 | 264 | 37.5% | 0.0% |
| Period 3 of 2026-27 | 264 | 48.5% | 1.5% |
| Period 2 of 2026-27 | 262 | 54.2% | 0.0% |
| Period 1 of 2026-27 | 298 | 45.6% | 1.3% |
| Period 13 of 2025-26 | 290 | 58.3% | 0.7% |
| Period 12 of 2025-26 | 250 | 54.7% | 2.0% |
| Period 11 of 2025-26 | 244 | 58.6% | 4.9% |
| Period 10 of 2025-26 | 229 | 44.2% | 1.3% |
| Period 9 of 2025-26 | 263 | 60.8% | 1.1% |
| Period 8 of 2025-26 | 264 | 66.2% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Haymarket
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 184,685 | 86.7% | 1.4% |
| TransPennine Express | 5,216 | 71.8% | 3.7% |
| Avanti | 4,677 | 66.1% | 4.5% |
| CrossCountry | 2,409 | 65.0% | 11.4% |
| Lumo (East Coast) | 687 | 80.6% | 17.8% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out