Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Lumo (East Coast) at Haymarket

All trains at HaymarketLumo (East Coast) across BritainScotland

On time, last 13 periods80.6%Whole station: 85.0%
Cancelled17.8%Whole station: 1.7%
Scheduled stops687Of 201,091 at the station

How this operator is doing here

Lumo (East Coast) had 687 scheduled stops at Haymarket in the 13 periods to Period 7 of 2026-27, 0% of the station's total. 80.6% of recorded arrivals came within three minutes and 17.8% of stops were cancelled.

Lumo (East Coast) trains at Haymarket also serve Edinburgh (2.0 km north-east, 68.3% on time, 2.2% cancelled), Falkirk High (36.0 km west, 87.0% on time, 17.8% cancelled), Glasgow Queen Street (65.0 km west, 86.1% on time, 17.8% cancelled), Alnmouth (116.7 km south-east, – on time, – cancelled), Morpeth (130.0 km south-east, 57.8% on time, 1.0% cancelled) and Newcastle (148.4 km south-east, 58.8% on time, 1.0% cancelled), which are the stations on its network closest to Haymarket.

The busiest Lumo (East Coast) station within 30 km of Haymarket is Edinburgh, 2.0 km north-east, with about 9 scheduled stops a day.

Lumo (East Coast) ranks 2nd of the 6 operators with enough records at Haymarket, on 80.6%.

For Lumo (East Coast), Haymarket is the 3rd best of 8 ranked stations. Its 80.6% here is 13.9 percentage points above the 66.7% across the whole network.

Lumo (East Coast) cancels more at Haymarket than elsewhere: 17.8% of scheduled stops, against 3.0% across its network and 1.7% for every operator at the station.

Period by period

70%75%80%85%90%2023-242024-252025-262026-27Period 11 of 2025-26: 72.9%Period 12 of 2025-26: 84.5%Period 13 of 2025-26: 85.1%Period 1 of 2026-27: 87.1%Period 2 of 2026-27: 88.6%Period 3 of 2026-27: 75.4%Period 4 of 2026-27: 72.7%Period 5 of 2026-27: 74.6%Period 6 of 2026-27: 81.8%Period 7 of 2026-27: 80.8%
This pageGreat Britain
0%10%20%30%40%Period 11 of 2025-26: 14.3%Period 12 of 2025-26: 14.7%Period 13 of 2025-26: 11.8%Period 1 of 2026-27: 17.3%Period 2 of 2026-27: 32.3%Period 3 of 2026-27: 16.2%Period 4 of 2026-27: 24.1%Period 5 of 2026-27: 13.2%Period 6 of 2026-27: 19.1%Period 7 of 2026-27: 16.1%2023-242024-252025-262026-27

See how Lumo (East Coast) Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-276280.8%16.1%
Period 6 of 2026-276881.8%19.1%
Period 5 of 2026-276874.6%13.2%
Period 4 of 2026-275872.7%24.1%
Period 3 of 2026-276875.4%16.2%
Period 2 of 2026-276588.6%32.3%
Period 1 of 2026-277587.1%17.3%
Period 13 of 2025-267685.1%11.8%
Period 12 of 2025-266884.5%14.7%
Period 11 of 2025-265672.9%14.3%
Period 10 of 2025-2623––
Period 9 of 2025-260––
Period 8 of 2025-260––

Other operators at Haymarket

OperatorScheduled stopsWithin 3 minCancelled
ScotRail184,68586.7%1.4%
TransPennine Express5,21671.8%3.7%
Avanti4,67766.1%4.5%
LNER3,41751.2%1.3%
CrossCountry2,40965.0%11.4%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out