Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

LNER at Darlington

All trains at DarlingtonLNER across BritainNorth East

On time, last 13 periods65.1%Whole station: 74.7%
Cancelled1.9%Whole station: 2.4%
Scheduled stops24,414Of 75,796 at the station

How this operator is doing here

LNER had 24,414 scheduled stops at Darlington in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 65.1% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.

LNER trains at Darlington also serve Thornaby (16.4 km east, – on time, – cancelled), Middlesbrough (21.2 km east, – on time, – cancelled), Northallerton (22.0 km south, 63.5% on time, 2.6% cancelled), Durham (28.9 km north, 68.1% on time, 2.4% cancelled), Thirsk (34.4 km south, – on time, – cancelled) and Newcastle (50.0 km north, 63.7% on time, 2.3% cancelled), which are the stations on its network closest to Darlington.

The busiest LNER station within 30 km of Darlington is Durham, 28.9 km north, with about 42 scheduled stops a day.

Of the 4 operators with enough records at Darlington, LNER is the least punctual, at 65.1%.

For LNER, Darlington is the 21st best of 35 ranked stations. Its 65.1% here is 2.5 percentage points below the 67.6% across the whole network.

LNER at Darlington has slipped sharply. 65.1% of stops came within three minutes of the timetable in the latest 13 periods, 6.4 percentage points worse than the 71.5% recorded in the 13 before. Cancellations held steady at 1.9% of scheduled stops, against 1.5% before.

Period by period

40%60%80%2023-242024-252025-262026-27Period 1 of 2023-24: 76.9%Period 2 of 2023-24: 74.4%Period 3 of 2023-24: 68.3%Period 4 of 2023-24: 72.7%Period 5 of 2023-24: 71.4%Period 6 of 2023-24: 75.0%Period 7 of 2023-24: 65.2%Period 8 of 2023-24: 46.6%Period 9 of 2023-24: 60.5%Period 10 of 2023-24: 58.5%Period 11 of 2023-24: 66.3%Period 12 of 2023-24: 72.9%Period 13 of 2023-24: 74.4%Period 1 of 2024-25: 73.2%Period 2 of 2024-25: 72.9%Period 3 of 2024-25: 73.2%Period 4 of 2024-25: 68.2%Period 5 of 2024-25: 70.5%Period 6 of 2024-25: 69.6%Period 7 of 2024-25: 71.0%Period 8 of 2024-25: 72.7%Period 9 of 2024-25: 59.2%Period 10 of 2024-25: 66.5%Period 11 of 2024-25: 68.8%Period 12 of 2024-25: 75.7%Period 13 of 2024-25: 73.1%Period 1 of 2025-26: 76.9%Period 2 of 2025-26: 72.1%Period 3 of 2025-26: 75.4%Period 4 of 2025-26: 74.1%Period 5 of 2025-26: 66.7%Period 6 of 2025-26: 74.3%Period 7 of 2025-26: 73.6%Period 8 of 2025-26: 67.3%Period 9 of 2025-26: 68.0%Period 10 of 2025-26: 65.9%Period 11 of 2025-26: 66.7%Period 12 of 2025-26: 70.5%Period 13 of 2025-26: 69.4%Period 1 of 2026-27: 60.9%Period 2 of 2026-27: 64.2%Period 3 of 2026-27: 64.5%Period 4 of 2026-27: 62.1%Period 5 of 2026-27: 61.5%Period 6 of 2026-27: 63.0%Period 7 of 2026-27: 64.2%
This pageGreat Britain
0%5%10%Period 1 of 2023-24: 2.5%Period 2 of 2023-24: 3.2%Period 3 of 2023-24: 1.6%Period 4 of 2023-24: 1.2%Period 5 of 2023-24: 1.3%Period 6 of 2023-24: 1.2%Period 7 of 2023-24: 1.8%Period 8 of 2023-24: 9.2%Period 9 of 2023-24: 2.2%Period 10 of 2023-24: 6.7%Period 11 of 2023-24: 4.3%Period 12 of 2023-24: 2.3%Period 13 of 2023-24: 3.5%Period 1 of 2024-25: 1.5%Period 2 of 2024-25: 2.7%Period 3 of 2024-25: 3.2%Period 4 of 2024-25: 3.7%Period 5 of 2024-25: 4.0%Period 6 of 2024-25: 1.6%Period 7 of 2024-25: 2.0%Period 8 of 2024-25: 0.4%Period 9 of 2024-25: 2.3%Period 10 of 2024-25: 1.5%Period 11 of 2024-25: 2.1%Period 12 of 2024-25: 1.0%Period 13 of 2024-25: 0.8%Period 1 of 2025-26: 1.1%Period 2 of 2025-26: 1.7%Period 3 of 2025-26: 0.9%Period 4 of 2025-26: 1.3%Period 5 of 2025-26: 3.5%Period 6 of 2025-26: 0.9%Period 7 of 2025-26: 2.0%Period 8 of 2025-26: 1.4%Period 9 of 2025-26: 2.5%Period 10 of 2025-26: 1.8%Period 11 of 2025-26: 2.1%Period 12 of 2025-26: 2.6%Period 13 of 2025-26: 1.7%Period 1 of 2026-27: 2.1%Period 2 of 2026-27: 1.4%Period 3 of 2026-27: 2.6%Period 4 of 2026-27: 1.0%Period 5 of 2026-27: 2.6%Period 6 of 2026-27: 2.7%Period 7 of 2026-27: 0.7%2023-242024-252025-262026-27

See how LNER Delay Repay works

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-271,88464.2%0.7%
Period 6 of 2026-271,89363.0%2.7%
Period 5 of 2026-271,88761.5%2.6%
Period 4 of 2026-271,89062.1%1.0%
Period 3 of 2026-271,89264.5%2.6%
Period 2 of 2026-271,87464.2%1.4%
Period 1 of 2026-272,16460.9%2.1%
Period 13 of 2025-261,57769.4%1.7%
Period 12 of 2025-261,88170.5%2.6%
Period 11 of 2025-261,89066.7%2.1%
Period 10 of 2025-261,76365.9%1.8%
Period 9 of 2025-261,85668.0%2.5%
Period 8 of 2025-261,96367.3%1.4%

Time of year

60%70%80%90%P1: 71.6%1P2: 70.8%2P3: 70.5%3P4: 69.3%4P5: 67.4%5P6: 70.5%6P7: 68.6%7P8: 62.6%8P9: 62.7%9P10: 63.9%10P11: 67.4%11P12: 72.9%12P13: 72.4%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other operators at Darlington

OperatorScheduled stopsWithin 3 minCancelled
Northern24,53988.9%1.7%
CrossCountry13,47966.1%3.7%
TransPennine Express13,35474.7%3.3%
Grand Central10––

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out