LNER at Darlington
How this operator is doing here
LNER had 24,414 scheduled stops at Darlington in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 65.1% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
LNER trains at Darlington also serve Thornaby (16.4 km east, – on time, – cancelled), Middlesbrough (21.2 km east, – on time, – cancelled), Northallerton (22.0 km south, 63.5% on time, 2.6% cancelled), Durham (28.9 km north, 68.1% on time, 2.4% cancelled), Thirsk (34.4 km south, – on time, – cancelled) and Newcastle (50.0 km north, 63.7% on time, 2.3% cancelled), which are the stations on its network closest to Darlington.
The busiest LNER station within 30 km of Darlington is Durham, 28.9 km north, with about 42 scheduled stops a day.
Of the 4 operators with enough records at Darlington, LNER is the least punctual, at 65.1%.
For LNER, Darlington is the 21st best of 35 ranked stations. Its 65.1% here is 2.5 percentage points below the 67.6% across the whole network.
LNER at Darlington has slipped sharply. 65.1% of stops came within three minutes of the timetable in the latest 13 periods, 6.4 percentage points worse than the 71.5% recorded in the 13 before. Cancellations held steady at 1.9% of scheduled stops, against 1.5% before.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,884 | 64.2% | 0.7% |
| Period 6 of 2026-27 | 1,893 | 63.0% | 2.7% |
| Period 5 of 2026-27 | 1,887 | 61.5% | 2.6% |
| Period 4 of 2026-27 | 1,890 | 62.1% | 1.0% |
| Period 3 of 2026-27 | 1,892 | 64.5% | 2.6% |
| Period 2 of 2026-27 | 1,874 | 64.2% | 1.4% |
| Period 1 of 2026-27 | 2,164 | 60.9% | 2.1% |
| Period 13 of 2025-26 | 1,577 | 69.4% | 1.7% |
| Period 12 of 2025-26 | 1,881 | 70.5% | 2.6% |
| Period 11 of 2025-26 | 1,890 | 66.7% | 2.1% |
| Period 10 of 2025-26 | 1,763 | 65.9% | 1.8% |
| Period 9 of 2025-26 | 1,856 | 68.0% | 2.5% |
| Period 8 of 2025-26 | 1,963 | 67.3% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Darlington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,539 | 88.9% | 1.7% |
| CrossCountry | 13,479 | 66.1% | 3.7% |
| TransPennine Express | 13,354 | 74.7% | 3.3% |
| Grand Central | 10 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out