CrossCountry had 13,479 scheduled stops at Darlington in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 66.1% of recorded arrivals came within three minutes and 3.7% of stops were cancelled.
CrossCountry trains at Darlington also serve Durham (28.9 km north, 64.2% on time, 3.8% cancelled), Newcastle (50.0 km north, 65.1% on time, 3.9% cancelled), York (69.2 km south-east, 58.4% on time, 3.6% cancelled), Morpeth (71.9 km north, 64.6% on time, 3.2% cancelled), Leeds (80.7 km south, 61.3% on time, 4.8% cancelled) and Wakefield Westgate (93.2 km south, 53.4% on time, 4.9% cancelled), which are the stations on its network closest to Darlington.
The busiest CrossCountry station within 30 km of Darlington is Durham, 28.9 km north, with about 37 scheduled stops a day.
CrossCountry ranks 3rd of the 4 operators with enough records at Darlington, on 66.1%.
CrossCountry at Darlington has edged up: 66.1% of stops came within three minutes of the timetable in the latest 13 periods, 3.2 percentage points better than the 62.9% of the 13 before. Cancellations rose to 3.7% of scheduled stops from 3.2%, which is 0.5 percentage points more.
Over three full railway years CrossCountry at Darlington has improved each time, from 61.8% within three minutes in 2023-24 to 64.5% in 2024-25 and 65.9% in 2025-26.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,096 | 67.6% | 4.3% |
| Period 6 of 2026-27 | 1,121 | 65.4% | 7.0% |
| Period 5 of 2026-27 | 1,119 | 64.4% | 3.8% |
| Period 4 of 2026-27 | 1,128 | 60.3% | 3.8% |
| Period 3 of 2026-27 | 1,052 | 65.2% | 4.2% |
| Period 2 of 2026-27 | 1,057 | 64.3% | 4.4% |
| Period 1 of 2026-27 | 1,273 | 66.9% | 2.7% |
| Period 13 of 2025-26 | 971 | 73.0% | 3.0% |
| Period 12 of 2025-26 | 972 | 73.5% | 1.4% |
| Period 11 of 2025-26 | 914 | 77.5% | 2.3% |
| Period 10 of 2025-26 | 885 | 66.6% | 5.5% |
| Period 9 of 2025-26 | 927 | 55.9% | 2.9% |
| Period 8 of 2025-26 | 964 | 59.6% | 3.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Darlington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 24,539 | 88.9% | 1.7% |
| LNER | 24,414 | 65.1% | 1.9% |
| TransPennine Express | 13,354 | 74.7% | 3.3% |
| Grand Central | 10 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out