Northern at Darlington
How this operator is doing here
Northern had 24,539 scheduled stops at Darlington in the 13 periods to Period 7 of 2026-27, 32% of the station's total. 88.9% of recorded arrivals came within three minutes and 1.7% of stops were cancelled.
Northern trains at Darlington also serve North Road (Darlington) (1.8 km north, 88.8% on time, 2.1% cancelled), Dinsdale (5.2 km east, 87.6% on time, 1.5% cancelled), Heighington (8.8 km north, 87.4% on time, 2.1% cancelled), Newton Aycliffe (10.7 km north, 88.0% on time, 2.1% cancelled), Allens West (12.0 km east, 88.8% on time, 1.5% cancelled) and Eaglescliffe (12.8 km east, 85.4% on time, 1.5% cancelled), which are the stations on its network closest to Darlington.
Within 30 km of here, Northern runs best at South Bank, 24.9 km east (94.5%), and worst at Stockton, 15.8 km east (76.4%).
The busiest Northern station within 30 km of Darlington is Middlesbrough, 21.2 km east, with about 134 scheduled stops a day.
Of the 4 operators with enough records at Darlington, Northern is the most punctual, at 88.9%.
Northern at Darlington has edged up: 88.9% of stops came within three minutes of the timetable in the latest 13 periods, 2.9 percentage points better than the 86.0% of the 13 before. Cancellations fell to 1.7% of scheduled stops from 3.2%, which is 1.5 percentage points fewer.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,922 | 92.1% | 1.0% |
| Period 6 of 2026-27 | 1,926 | 92.4% | 2.5% |
| Period 5 of 2026-27 | 1,922 | 85.9% | 1.6% |
| Period 4 of 2026-27 | 1,920 | 91.2% | 1.8% |
| Period 3 of 2026-27 | 1,924 | 93.3% | 1.4% |
| Period 2 of 2026-27 | 1,914 | 88.9% | 1.4% |
| Period 1 of 2026-27 | 2,216 | 88.4% | 0.9% |
| Period 13 of 2025-26 | 1,932 | 89.3% | 1.9% |
| Period 12 of 2025-26 | 1,924 | 89.7% | 0.8% |
| Period 11 of 2025-26 | 1,924 | 89.5% | 1.2% |
| Period 10 of 2025-26 | 1,644 | 86.3% | 4.2% |
| Period 9 of 2025-26 | 1,618 | 83.9% | 1.5% |
| Period 8 of 2025-26 | 1,753 | 82.6% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Darlington
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 24,414 | 65.1% | 1.9% |
| CrossCountry | 13,479 | 66.1% | 3.7% |
| TransPennine Express | 13,354 | 74.7% | 3.3% |
| Grand Central | 10 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out