Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Grand Central at Darlington

All trains at DarlingtonGrand Central across BritainNorth East

On time, last 13 periods–Whole station: 74.7%
Cancelled–Whole station: 2.4%
Scheduled stops10Of 75,796 at the station

How this operator is doing here

There are not enough usable records of Grand Central at Darlington to report how punctual it is.

Period by period

40%60%80%2023-242024-252025-262026-27Period 8 of 2024-25: 35.2%
This pageGreat Britain
0%2%4%Period 8 of 2024-25: 3.6%2023-242024-252025-262026-27

See how Grand Central Delay Repay works

The last 13 periods

Other operators at Darlington

OperatorScheduled stopsWithin 3 minCancelled
Northern24,53988.9%1.7%
LNER24,41465.1%1.9%
CrossCountry13,47966.1%3.7%
TransPennine Express13,35474.7%3.3%

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out