Fearn
FRNScotlandManaged by ScotRail
How this station is performing
Fearn had 4,298 scheduled stops to Period 7 of 2026-27, about 12 a day. 82.8% of recorded arrivals were within three minutes of the timetable and 2.7% of scheduled stops were cancelled.
Fearn opened on 1 June 1864, 162 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Nairn is the oldest (1855) and Golspie the newest (1868), with Fearn in between.
The nearest stations to Fearn are Tain (5.3 km north-west), Invergordon (14.5 km south-west), Alness (17.8 km south-west), Golspie (21.5 km north) and Nairn (23.1 km south). 1 stations lie within 10 km in all. At 82.8%, Fearn is less punctual than all of them; the best of the five, Invergordon, manages 84.8%.
Fearn takes its name from a settlement called Fearn, and the station stands 2.5 km from its centre.
Fearn improved sharply over the past year. In the latest 13 periods 82.8% of stops came within three minutes of the timetable, up 10.6 percentage points from 72.2% in the 13 before. Cancellations held steady at 2.7% of scheduled stops, against 2.7% before.
1 of 3 stations of a similar size in Scotland are more punctual than Fearn on 82.8%. The comparison group includes Carrbridge (68.5%), Blair Atholl (54.5%) and Tain (83.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 4,298 | 82.8% | 2.7% |
Operators with their own page for this station are linked to it.
Late train at Fearn? Delay Repay
These operators call at Fearn and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 351 | 77.6% | 2.3% |
| Period 6 of 2026-27 | 348 | 86.4% | 3.2% |
| Period 5 of 2026-27 | 350 | 88.2% | 2.9% |
| Period 4 of 2026-27 | 342 | 83.7% | 3.2% |
| Period 3 of 2026-27 | 95 | 87.4% | 0.0% |
| Period 2 of 2026-27 | 352 | 88.5% | 0.9% |
| Period 1 of 2026-27 | 404 | 90.0% | 1.0% |
| Period 13 of 2025-26 | 384 | 88.4% | 1.6% |
| Period 12 of 2025-26 | 352 | 90.6% | 2.8% |
| Period 11 of 2025-26 | 325 | 78.2% | 4.9% |
| Period 10 of 2025-26 | 296 | 83.3% | 5.1% |
| Period 9 of 2025-26 | 348 | 72.7% | 4.3% |
| Period 8 of 2025-26 | 351 | 61.9% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Carrbridge | 4,317 | 68.5% | 1.3% |
| Blair Atholl | 4,222 | 54.5% | 1.3% |
| Tain | 4,592 | 83.2% | 2.7% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out