ScotRail at Blair Atholl
How this operator is doing here
ScotRail had 3,555 scheduled stops at Blair Atholl in the 13 periods to Period 7 of 2026-27, 84% of the station's total. 53.8% of recorded arrivals came within three minutes and 1.1% of stops were cancelled.
ScotRail trains at Blair Atholl also serve Pitlochry (9.8 km south-east, 64.5% on time, 1.1% cancelled), Dunkeld and Birnam (28.6 km south-east, 67.6% on time, 1.2% cancelled), Dalwhinnie (30.6 km north-west, 51.9% on time, 1.2% cancelled), Newtonmore (36.5 km north-west, – on time, 1.0% cancelled), Kingussie (36.9 km north, 60.5% on time, 1.1% cancelled) and Rannoch (45.2 km west, 70.3% on time, 0.6% cancelled), which are the stations on its network closest to Blair Atholl.
The busiest ScotRail station within 30 km of Blair Atholl is Pitlochry, 9.8 km south-east, with about 20 scheduled stops a day.
Of the 1 operators with enough records at Blair Atholl, ScotRail is the most punctual, at 53.8%.
For ScotRail, Blair Atholl is the 311th best of 312 ranked stations. Its 53.8% here is 34.1 percentage points below the 87.9% across the whole network.
Over three full railway years ScotRail at Blair Atholl has got worse each time, from 62.4% within three minutes in 2023-24 to 58.2% in 2024-25 and 53.3% in 2025-26.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 288 | 39.7% | 1.4% |
| Period 6 of 2026-27 | 288 | 60.5% | 0.7% |
| Period 5 of 2026-27 | 288 | 58.1% | 2.8% |
| Period 4 of 2026-27 | 288 | 51.7% | 0.0% |
| Period 3 of 2026-27 | 288 | 60.6% | 0.3% |
| Period 2 of 2026-27 | 276 | 63.6% | 0.7% |
| Period 1 of 2026-27 | 304 | 63.4% | 2.0% |
| Period 13 of 2025-26 | 290 | 67.6% | 1.0% |
| Period 12 of 2025-26 | 264 | 61.3% | 0.0% |
| Period 11 of 2025-26 | 264 | 45.3% | 2.3% |
| Period 10 of 2025-26 | 227 | 44.9% | 0.0% |
| Period 9 of 2025-26 | 264 | 42.5% | 1.5% |
| Period 8 of 2025-26 | 226 | 32.3% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Blair Atholl
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Caledonian Sleeper | 618 | – | – |
| LNER | 49 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out