Aberdeen
ABDScotlandManaged by ScotRail
How this station is performing
Aberdeen had 46,944 scheduled stops to Period 7 of 2026-27, about 129 a day. 85.7% of recorded arrivals were within three minutes of the timetable and 2.0% of scheduled stops were cancelled.
Aberdeen opened on 4 November 1867, 159 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Aberdeen is the newest; the oldest, Stonehaven, opened in 1849.
The nearest stations to Aberdeen are Dyce (9.1 km north-west), Portlethen (9.2 km south), Kintore (18.9 km north-west), Stonehaven (21.0 km south) and Inverurie (23.0 km north-west). 2 stations lie within 10 km in all. Of the five, Kintore is the most punctual at 88.8% and Stonehaven the least at 79.5%, with Aberdeen on 85.7%.
Aberdeen is one of 3 stations named after a big city called Aberdeen, home to about 200,680 people; this one stands 0.8 km from its centre.
4 operators call at Aberdeen: ScotRail (86.6%, 91% of stops), LNER (73.3%, 6% of stops), CrossCountry (76.1%, 2% of stops) and Caledonian Sleeper (–, 1% of stops). The operator you travel with matters: ScotRail reaches 86.6% within three minutes while LNER manages 73.3%, a gap of 13.3 percentage points.
1 of 3 stations of a similar size in Scotland are more punctual than Aberdeen on 85.7%. The comparison group includes Singer (84.9%), Drumchapel (87.7%) and Drumry (85.6%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 42,864 | 86.6% | 1.6% |
| LNER | 2,669 | 73.3% | 1.9% |
| CrossCountry | 1,120 | 76.1% | 15.6% |
| Caledonian Sleeper | 291 | – | – |
Operators with their own page for this station are linked to it.
Late train at Aberdeen? Delay Repay
These operators call at Aberdeen and publish Delay Repay rules.
- ScotRail: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- CrossCountry: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Caledonian Sleeper: pays for a delay of 30 minutes or more
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,674 | 85.6% | 1.2% |
| Period 6 of 2026-27 | 3,702 | 90.0% | 1.5% |
| Period 5 of 2026-27 | 3,700 | 85.5% | 2.9% |
| Period 4 of 2026-27 | 3,704 | 86.6% | 1.3% |
| Period 3 of 2026-27 | 3,692 | 88.0% | 1.7% |
| Period 2 of 2026-27 | 3,669 | 88.4% | 1.8% |
| Period 1 of 2026-27 | 4,190 | 87.8% | 2.4% |
| Period 13 of 2025-26 | 3,979 | 87.6% | 1.8% |
| Period 12 of 2025-26 | 3,156 | 86.8% | 2.2% |
| Period 11 of 2025-26 | 3,189 | 80.2% | 2.8% |
| Period 10 of 2025-26 | 3,113 | 80.0% | 3.3% |
| Period 9 of 2025-26 | 3,582 | 83.1% | 1.7% |
| Period 8 of 2025-26 | 3,594 | 82.2% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Singer | 47,082 | 84.9% | 2.1% |
| Drumchapel | 46,774 | 87.7% | 2.1% |
| Drumry | 46,774 | 85.6% | 2.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out