Drumchapel
DMCScotlandManaged by ScotRail
How this station is performing
Drumchapel had 46,774 scheduled stops to Period 7 of 2026-27, about 128 a day. 87.7% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Drumchapel opened on 1 May 1890, 136 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Yoker is the oldest (1882) and Garscadden the newest (1960), with Drumchapel in between.
The nearest stations to Drumchapel are Drumry (1.4 km west), Westerton (1.7 km east), Garscadden (1.9 km south), Yoker (2.0 km south-west) and Scotstounhill (2.3 km south). 52 stations lie within 10 km in all. Of the five, Yoker is the most punctual at 87.8% and Drumry the least at 85.6%, with Drumchapel on 87.7%.
Drumchapel is named after Old Drumchapel, a suburb, but the station stands 0.5 km from its centre.
The time of year matters a great deal for Drumchapel. Averaged over every railway year in the data, period 8 (late October and November) is the weakest at 80.4%, while period 2 (May) is the strongest at 91.1%, a spread of 10.7 percentage points.
Compared with 3 stations of a similar size in Scotland, Drumchapel is the most punctual, at 87.7%. The comparison group includes Drumry (85.6%), Aberdeen (85.7%) and Singer (84.9%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 46,774 | 87.7% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Drumchapel? Delay Repay
These operators call at Drumchapel and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,560 | 85.9% | 2.4% |
| Period 6 of 2026-27 | 3,560 | 89.4% | 1.2% |
| Period 5 of 2026-27 | 3,560 | 89.4% | 1.7% |
| Period 4 of 2026-27 | 3,538 | 90.0% | 4.1% |
| Period 3 of 2026-27 | 3,560 | 91.0% | 1.2% |
| Period 2 of 2026-27 | 3,560 | 89.0% | 1.2% |
| Period 1 of 2026-27 | 4,112 | 89.8% | 1.4% |
| Period 13 of 2025-26 | 3,895 | 90.0% | 1.4% |
| Period 12 of 2025-26 | 3,560 | 88.7% | 1.4% |
| Period 11 of 2025-26 | 3,560 | 88.3% | 1.9% |
| Period 10 of 2025-26 | 3,183 | 86.0% | 2.3% |
| Period 9 of 2025-26 | 3,566 | 80.0% | 4.1% |
| Period 8 of 2025-26 | 3,560 | 81.1% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Scotland
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out