LNER at Aberdeen
How this operator is doing here
LNER had 2,669 scheduled stops at Aberdeen in the 13 periods to Period 7 of 2026-27, 6% of the station's total. 73.3% of recorded arrivals came within three minutes and 1.9% of stops were cancelled.
LNER trains at Aberdeen also serve Stonehaven (21.0 km south, 66.8% on time, 1.9% cancelled), Laurencekirk (40.6 km south-west, – on time, – cancelled), Montrose (52.9 km south-west, 63.0% on time, 1.8% cancelled), Arbroath (71.4 km south-west, 62.4% on time, 1.8% cancelled), Carnoustie (80.4 km south-west, – on time, – cancelled) and Dundee (93.0 km south-west, 67.3% on time, 1.6% cancelled), which are the stations on its network closest to Aberdeen.
The busiest LNER station within 30 km of Aberdeen is Stonehaven, 21.0 km south, with about 7 scheduled stops a day.
Of the 3 operators with enough records at Aberdeen, LNER is the least punctual, at 73.3%.
For LNER, Aberdeen is the 8th best of 35 ranked stations. Its 73.3% here is 5.7 percentage points above the 67.6% across the whole network.
LNER at Aberdeen has slipped sharply. 73.3% of stops came within three minutes of the timetable in the latest 13 periods, 7.8 percentage points worse than the 81.1% recorded in the 13 before. Cancellations rose to 1.9% of scheduled stops from 0.8%, which is 1.1 percentage points more.
Period by period
See how LNER Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 208 | 76.2% | 1.0% |
| Period 6 of 2026-27 | 208 | 71.6% | 1.9% |
| Period 5 of 2026-27 | 208 | 66.7% | 1.9% |
| Period 4 of 2026-27 | 208 | 68.8% | 0.0% |
| Period 3 of 2026-27 | 208 | 73.0% | 1.9% |
| Period 2 of 2026-27 | 206 | 74.5% | 1.0% |
| Period 1 of 2026-27 | 235 | 68.3% | 2.1% |
| Period 13 of 2025-26 | 228 | 71.2% | 0.9% |
| Period 12 of 2025-26 | 176 | 75.6% | 2.3% |
| Period 11 of 2025-26 | 188 | 74.6% | 5.9% |
| Period 10 of 2025-26 | 180 | 70.3% | 2.8% |
| Period 9 of 2025-26 | 208 | 80.5% | 1.4% |
| Period 8 of 2025-26 | 208 | 82.4% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Aberdeen
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 42,864 | 86.6% | 1.6% |
| CrossCountry | 1,120 | 76.1% | 15.6% |
| Caledonian Sleeper | 291 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out