ScotRail at Aberdeen
How this operator is doing here
ScotRail had 42,864 scheduled stops at Aberdeen in the 13 periods to Period 7 of 2026-27, 91% of the station's total. 86.6% of recorded arrivals came within three minutes and 1.6% of stops were cancelled.
ScotRail trains at Aberdeen also serve Dyce (9.1 km north-west, 88.3% on time, 2.0% cancelled), Portlethen (9.2 km south, – on time, 2.2% cancelled), Kintore (18.9 km north-west, 88.8% on time, 2.0% cancelled), Stonehaven (21.0 km south, 81.2% on time, 1.9% cancelled), Inverurie (23.0 km north-west, 88.5% on time, 2.0% cancelled) and Insch (38.0 km north-west, 76.1% on time, 1.2% cancelled), which are the stations on its network closest to Aberdeen.
Within 30 km of here, ScotRail runs best at Kintore, 18.9 km north-west (88.8%), and worst at Stonehaven, 21.0 km south (81.2%).
The busiest ScotRail station within 30 km of Aberdeen is Inverurie, 23.0 km north-west, with about 57 scheduled stops a day.
Of the 3 operators with enough records at Aberdeen, ScotRail is the most punctual, at 86.6%.
For ScotRail, Aberdeen is the 186th best of 312 ranked stations. Its 86.6% here is 1.3 percentage points below the 87.9% across the whole network.
Cancellations of ScotRail at Aberdeen are near its usual level: 1.6% of scheduled stops, against 1.6% across its network and 2.0% for every operator at the station.
Period by period
See how ScotRail Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 3,368 | 86.2% | 1.0% |
| Period 6 of 2026-27 | 3,367 | 91.5% | 1.1% |
| Period 5 of 2026-27 | 3,364 | 87.2% | 2.7% |
| Period 4 of 2026-27 | 3,368 | 87.8% | 1.1% |
| Period 3 of 2026-27 | 3,368 | 89.2% | 1.2% |
| Period 2 of 2026-27 | 3,339 | 89.4% | 1.2% |
| Period 1 of 2026-27 | 3,823 | 89.0% | 1.7% |
| Period 13 of 2025-26 | 3,619 | 89.0% | 1.7% |
| Period 12 of 2025-26 | 2,879 | 87.7% | 1.9% |
| Period 11 of 2025-26 | 2,923 | 80.6% | 2.1% |
| Period 10 of 2025-26 | 2,844 | 80.8% | 2.8% |
| Period 9 of 2025-26 | 3,294 | 83.4% | 1.5% |
| Period 8 of 2025-26 | 3,308 | 82.2% | 1.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Aberdeen
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| LNER | 2,669 | 73.3% | 1.9% |
| CrossCountry | 1,120 | 76.1% | 15.6% |
| Caledonian Sleeper | 291 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out