CrossCountry at Aberdeen
How this operator is doing here
CrossCountry had 1,120 scheduled stops at Aberdeen in the 13 periods to Period 7 of 2026-27, 2% of the station's total. 76.1% of recorded arrivals came within three minutes and 15.6% of stops were cancelled.
CrossCountry trains at Aberdeen also serve Stonehaven (21.0 km south, 85.4% on time, 11.1% cancelled), Laurencekirk (40.6 km south-west, – on time, – cancelled), Montrose (52.9 km south-west, 76.3% on time, 10.9% cancelled), Arbroath (71.4 km south-west, 73.7% on time, 10.6% cancelled), Dundee (93.0 km south-west, 66.8% on time, 13.5% cancelled) and Leuchars (For St. Andrews) (98.2 km south-west, 54.3% on time, 13.6% cancelled), which are the stations on its network closest to Aberdeen.
The busiest CrossCountry station within 30 km of Aberdeen is Stonehaven, 21.0 km south, with about 2 scheduled stops a day.
CrossCountry ranks 2nd of the 3 operators with enough records at Aberdeen, on 76.1%.
For CrossCountry, Aberdeen is the 9th best of 99 ranked stations. Its 76.1% here is 12.9 percentage points above the 63.2% across the whole network.
CrossCountry at Aberdeen has slipped sharply. 76.1% of stops came within three minutes of the timetable in the latest 13 periods, 7.7 percentage points worse than the 83.8% recorded in the 13 before. Cancellations rose to 15.6% of scheduled stops from 11.0%, which is 4.6 percentage points more.
Period by period
See how CrossCountry Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 74 | 79.4% | 8.1% |
| Period 6 of 2026-27 | 103 | 76.1% | 10.7% |
| Period 5 of 2026-27 | 104 | 68.4% | 8.7% |
| Period 4 of 2026-27 | 104 | 79.3% | 11.5% |
| Period 3 of 2026-27 | 92 | 76.3% | 17.4% |
| Period 2 of 2026-27 | 100 | 81.1% | 26.0% |
| Period 1 of 2026-27 | 109 | 82.5% | 26.6% |
| Period 13 of 2025-26 | 106 | 74.0% | 9.4% |
| Period 12 of 2025-26 | 82 | 79.7% | 9.8% |
| Period 11 of 2025-26 | 66 | 76.9% | 21.2% |
| Period 10 of 2025-26 | 70 | 64.7% | 27.1% |
| Period 9 of 2025-26 | 56 | 72.0% | 10.7% |
| Period 8 of 2025-26 | 54 | – | – |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Aberdeen
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| ScotRail | 42,864 | 86.6% | 1.6% |
| LNER | 2,669 | 73.3% | 1.9% |
| Caledonian Sleeper | 291 | – | – |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out