Non-Network Rail Infrastructure (TfW Cardiff Valleys)
Network Rail Non-Network Rail Infrastructure region
How this route is doing
Non-Network Rail Infrastructure (TfW Cardiff Valleys) is a Network Rail route in the Non-Network Rail Infrastructure region. In the 13 four-week periods to Period 7 of 2026-27 it handled 1,924,153 scheduled station stops, and 93.3% of recorded arrivals came within three minutes of the timetable while 3.0% of scheduled stops were cancelled.
Non-Network Rail Infrastructure (TfW Cardiff Valleys) is the most punctual of 18 routes, at 93.3% within three minutes, 9.7 percentage points above the national figure of 83.6%.
Cancellations on Non-Network Rail Infrastructure (TfW Cardiff Valleys) run lower than the national picture: 3.0% of scheduled stops against 3.2% for Great Britain, 0.2 percentage points fewer. That ranks 8th of 18 routes from the fewest.
Non-Network Rail Infrastructure (TfW Cardiff Valleys) has edged up: 93.3% of stops came within three minutes of the timetable in the latest 13 periods, 4.6 percentage points better than the 88.7% of the 13 before. Cancellations fell to 3.0% of scheduled stops from 4.1%, which is 1.1 percentage points fewer.
Non-Network Rail Infrastructure (TfW Cardiff Valleys) has not moved in one direction over three full railway years: 88.0% within three minutes in 2023-24, 85.1% in 2024-25 and 92.6% in 2025-26.
Non-Network Rail Infrastructure (TfW Cardiff Valleys) is the most punctual route in Non-Network Rail Infrastructure, on 93.3%. The other routes in the region are Non-Network Rail Infrastructure (Private Railway) (92.2%), Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) (86.4%) and Chiltern Rail Ltd (86.1%).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 143,258 | 93.2% | 3.0% |
| Period 6 of 2026-27 | 156,327 | 93.3% | 3.9% |
| Period 5 of 2026-27 | 123,179 | 92.5% | 3.5% |
| Period 4 of 2026-27 | 146,312 | 92.3% | 3.1% |
| Period 3 of 2026-27 | 150,962 | 93.8% | 3.4% |
| Period 2 of 2026-27 | 150,261 | 94.5% | 4.3% |
| Period 1 of 2026-27 | 177,881 | 95.2% | 3.1% |
| Period 13 of 2025-26 | 166,777 | 95.7% | 2.0% |
| Period 12 of 2025-26 | 143,805 | 94.7% | 1.7% |
| Period 11 of 2025-26 | 145,592 | 94.4% | 2.7% |
| Period 10 of 2025-26 | 135,625 | 91.0% | 2.9% |
| Period 9 of 2025-26 | 143,992 | 89.2% | 3.0% |
| Period 8 of 2025-26 | 140,182 | 91.8% | 1.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Non-Network Rail Infrastructure
| Route | Within 3 min | Cancelled |
|---|---|---|
| Non-Network Rail Infrastructure (Private Railway) | 92.2% | 3.5% |
| Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) | 86.4% | 1.5% |
| Chiltern Rail Ltd | 86.1% | 1.6% |
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out