Sussex is a Network Rail route in the Southern region. In the 13 four-week periods to Period 7 of 2026-27 it handled 8,097,399 scheduled station stops, and 83.7% of recorded arrivals came within three minutes of the timetable while 4.2% of scheduled stops were cancelled.
Sussex ranks 8th of 18 routes on 83.7% within three minutes, 0.1 percentage points above the national figure of 83.6%.
Cancellations on Sussex run higher than the national picture: 4.2% of scheduled stops against 3.2% for Great Britain, 1.0 percentage points more. That ranks 15th of 18 routes from the fewest.
Sussex has slipped a little, from 86.3% within three minutes in the previous 13 periods to 83.7% in the latest 13, a fall of 2.6 percentage points. Cancellations rose to 4.2% of scheduled stops from 3.7%, which is 0.5 percentage points more.
Over three full railway years Sussex has got worse each time, from 87.0% within three minutes in 2023-24 to 86.6% in 2024-25 and 85.9% in 2025-26.
Other routes in Southern are High Speed (79.6%), Kent (84.7%) and Wessex (82.1%), set against 83.7% for Sussex.
The National Rail timetable for 26 November 2026 schedules 21,286 passenger calls at the stations grouped under Sussex, an average of 146 for each of the 145 that had a train. The busiest were London Victoria (1,178 calls), East Croydon (886 calls), Vauxhall (880 calls) and Gatwick Airport (667 calls).
On Sussex the busiest hour of that day began at 18:00, with 1,310 calls, 73 of them at London Victoria. The first scheduled call of the service day is at Purley at 04:02 on a Thameslink train, and the last is at Horley at 03:48 on a Thameslink train.
Southern (68%), Thameslink (15%) and South Western Railway (6%) ran the most trains on Sussex, from 8 operators calling in all. The most frequent journey touching the route was London Waterloo to London Waterloo, with 93 South Western Railway trains.
Among the busiest stations, the longest wait between 06:00 and midnight was 16 minutes at West Croydon, between the 23:39 and the 23:55. Doleham (8 calls), Pevensey Bay (9 calls) and Faygate (24 calls) had the fewest trains of any station grouped under Sussex. 2 of its stations had ten calls or fewer.
Of the 138 stations here with at least 1,500 scheduled stops in the ORR figures, Birkbeck was the most punctual at 98.1% within three minutes and Cooksbridge the least at 66.1%. Trains calling on Sussex most often carry on to stations on Wessex (2,564 trains) and Kent (1,716 trains).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 622,401 | 79.7% | 4.1% |
| Period 6 of 2026-27 | 604,276 | 75.8% | 4.7% |
| Period 5 of 2026-27 | 614,559 | 79.2% | 6.4% |
| Period 4 of 2026-27 | 628,770 | 83.5% | 4.9% |
| Period 3 of 2026-27 | 607,936 | 83.5% | 4.4% |
| Period 2 of 2026-27 | 613,095 | 86.4% | 4.5% |
| Period 1 of 2026-27 | 711,031 | 88.4% | 3.2% |
| Period 13 of 2025-26 | 677,866 | 88.9% | 3.1% |
| Period 12 of 2025-26 | 623,965 | 85.9% | 3.6% |
| Period 11 of 2025-26 | 605,475 | 85.0% | 3.4% |
| Period 10 of 2025-26 | 552,483 | 85.3% | 3.7% |
| Period 9 of 2025-26 | 620,292 | 81.4% | 4.7% |
| Period 8 of 2025-26 | 615,250 | 84.0% | 4.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Southern
| Route | Within 3 min | Cancelled |
|---|---|---|
| High Speed | 79.6% | 1.8% |
| Kent | 84.7% | 2.5% |
| Wessex | 82.1% | 3.8% |
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out