Non-Network Rail Infrastructure (Private Railway)
Network Rail Non-Network Rail Infrastructure region
How this route is doing
Non-Network Rail Infrastructure (Private Railway) is a Network Rail route in the Non-Network Rail Infrastructure region. In the 13 four-week periods to Period 7 of 2026-27 it handled 4,458,781 scheduled station stops, and 92.2% of recorded arrivals came within three minutes of the timetable while 3.5% of scheduled stops were cancelled.
Non-Network Rail Infrastructure (Private Railway) ranks 2nd of 18 routes on 92.2% within three minutes, 8.6 percentage points above the national figure of 83.6%.
Cancellations on Non-Network Rail Infrastructure (Private Railway) run higher than the national picture: 3.5% of scheduled stops against 3.2% for Great Britain, 0.3 percentage points more. That ranks 12th of 18 routes from the fewest.
Non-Network Rail Infrastructure (Private Railway) has slipped a little, from 93.3% within three minutes in the previous 13 periods to 92.2% in the latest 13, a fall of 1.1 percentage points. Cancellations rose to 3.5% of scheduled stops from 2.6%, which is 0.9 percentage points more.
Non-Network Rail Infrastructure (Private Railway) has not moved in one direction over three full railway years: 91.7% within three minutes in 2023-24, 93.3% in 2024-25 and 93.3% in 2025-26.
Other routes in Non-Network Rail Infrastructure are Non-Network Rail Infrastructure (TfW Cardiff Valleys) (93.3%), Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) (86.4%) and Chiltern Rail Ltd (86.1%), set against 92.2% for Non-Network Rail Infrastructure (Private Railway).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 344,194 | 91.2% | 2.4% |
| Period 6 of 2026-27 | 330,554 | 90.1% | 4.4% |
| Period 5 of 2026-27 | 339,390 | 90.2% | 8.2% |
| Period 4 of 2026-27 | 343,704 | 92.4% | 3.7% |
| Period 3 of 2026-27 | 340,861 | 91.5% | 3.0% |
| Period 2 of 2026-27 | 340,373 | 93.1% | 3.5% |
| Period 1 of 2026-27 | 396,292 | 93.1% | 3.3% |
| Period 13 of 2025-26 | 361,865 | 93.9% | 2.4% |
| Period 12 of 2025-26 | 342,350 | 93.9% | 2.4% |
| Period 11 of 2025-26 | 344,296 | 92.2% | 3.4% |
| Period 10 of 2025-26 | 310,764 | 93.9% | 2.3% |
| Period 9 of 2025-26 | 331,616 | 90.8% | 2.8% |
| Period 8 of 2025-26 | 332,522 | 91.3% | 3.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Non-Network Rail Infrastructure
| Route | Within 3 min | Cancelled |
|---|---|---|
| Non-Network Rail Infrastructure (TfW Cardiff Valleys) | 93.3% | 3.0% |
| Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) | 86.4% | 1.5% |
| Chiltern Rail Ltd | 86.1% | 1.6% |
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out