Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd)
Network Rail Non-Network Rail Infrastructure region
How this route is doing
Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) is a Network Rail route in the Non-Network Rail Infrastructure region. In the 13 four-week periods to Period 7 of 2026-27 it handled 42,731 scheduled station stops, and 86.4% of recorded arrivals came within three minutes of the timetable while 1.5% of scheduled stops were cancelled.
Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) ranks 5th of 18 routes on 86.4% within three minutes, 2.8 percentage points above the national figure of 83.6%.
Cancellations on Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) run lower than the national picture: 1.5% of scheduled stops against 3.2% for Great Britain, 1.7 percentage points fewer. That ranks 1st of 18 routes from the fewest.
Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) has slipped a little, from 87.6% within three minutes in the previous 13 periods to 86.4% in the latest 13, a fall of 1.2 percentage points. Cancellations fell to 1.5% of scheduled stops from 2.1%, which is 0.6 percentage points fewer.
Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) has not moved in one direction over three full railway years: 86.4% within three minutes in 2023-24, 87.7% in 2024-25 and 87.1% in 2025-26.
Other routes in Non-Network Rail Infrastructure are Non-Network Rail Infrastructure (Private Railway) (92.2%), Non-Network Rail Infrastructure (TfW Cardiff Valleys) (93.3%) and Chiltern Rail Ltd (86.1%), set against 86.4% for Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 0 | – | – |
| Period 6 of 2026-27 | 0 | – | – |
| Period 5 of 2026-27 | 0 | – | – |
| Period 4 of 2026-27 | 0 | – | – |
| Period 3 of 2026-27 | 0 | – | – |
| Period 2 of 2026-27 | 0 | – | – |
| Period 1 of 2026-27 | 0 | – | – |
| Period 13 of 2025-26 | 8,126 | 90.6% | 1.3% |
| Period 12 of 2025-26 | 6,948 | 90.1% | 0.4% |
| Period 11 of 2025-26 | 7,457 | 88.8% | 2.4% |
| Period 10 of 2025-26 | 5,225 | 87.0% | 1.7% |
| Period 9 of 2025-26 | 7,968 | 81.0% | 1.7% |
| Period 8 of 2025-26 | 7,007 | 81.0% | 1.2% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Non-Network Rail Infrastructure
| Route | Within 3 min | Cancelled |
|---|---|---|
| Non-Network Rail Infrastructure (Private Railway) | 92.2% | 3.5% |
| Non-Network Rail Infrastructure (TfW Cardiff Valleys) | 93.3% | 3.0% |
| Chiltern Rail Ltd | 86.1% | 1.6% |
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out