Western
Network Rail Wales & Western region
How this route is doing
Western is a Network Rail route in the Wales & Western region. In the 13 four-week periods to Period 7 of 2026-27 it handled 5,317,606 scheduled station stops, and 77.4% of recorded arrivals came within three minutes of the timetable while 4.0% of scheduled stops were cancelled.
Western ranks 17th of 18 routes on 77.4% within three minutes, 6.2 percentage points below the national figure of 83.6%.
Cancellations on Western run higher than the national picture: 4.0% of scheduled stops against 3.2% for Great Britain, 0.8 percentage points more. That ranks 14th of 18 routes from the fewest.
Western has slipped a little, from 80.0% within three minutes in the previous 13 periods to 77.4% in the latest 13, a fall of 2.6 percentage points. Cancellations held steady at 4.0% of scheduled stops, against 3.7% before.
Western has not moved in one direction over three full railway years: 78.1% within three minutes in 2023-24, 79.8% in 2024-25 and 79.6% in 2025-26.
Other routes in Wales & Western are Wales (79.0%), set against 77.4% for Western.
The National Rail timetable for 26 November 2026 schedules 24,158 passenger calls at the stations grouped under Western, an average of 103 for each of the 233 that had a train. The busiest were London Paddington (1,232 calls), Reading (825 calls), Willesden Junction (800 calls) and Stonebridge Park (469 calls).
On Western the busiest hour of that day began at 07:00, with 1,482 calls, 76 of them at London Paddington. The first scheduled call of the service day is at Reading at 04:00 on a Great Western Railway train, and the last is at Brent Cross West at 03:58 on a Thameslink train.
Great Western Railway (50%), London Overground (16%) and London Underground (9%) ran the most trains on Western, from 13 operators calling in all. The most frequent journey touching the route was Shenfield to London Paddington, with 132 Elizabeth Line trains.
Among the busiest stations, the longest wait between 06:00 and midnight was 14 minutes at Slough, between the 23:01 and the 23:15. Lelant Saltings (2 calls), Ascott-under-Wychwood (2 calls) and Finstock (2 calls) had the fewest trains of any station grouped under Western. 8 of its stations had ten calls or fewer.
Of the 222 stations here with at least 1,500 scheduled stops in the ORR figures, Henley-on-Thames was the most punctual at 98.1% within three minutes and Pewsey the least at 49.1%. Trains calling on Western most often carry on to stations on Wessex (1,620 trains) and West Coast South (1,169 trains).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 408,151 | 78.5% | 3.3% |
| Period 6 of 2026-27 | 399,768 | 74.7% | 4.2% |
| Period 5 of 2026-27 | 407,234 | 71.9% | 6.6% |
| Period 4 of 2026-27 | 411,873 | 73.2% | 5.1% |
| Period 3 of 2026-27 | 405,364 | 76.4% | 5.5% |
| Period 2 of 2026-27 | 411,765 | 77.2% | 4.0% |
| Period 1 of 2026-27 | 467,465 | 81.8% | 2.6% |
| Period 13 of 2025-26 | 443,199 | 82.8% | 2.3% |
| Period 12 of 2025-26 | 393,804 | 83.8% | 2.1% |
| Period 11 of 2025-26 | 397,754 | 81.9% | 5.0% |
| Period 10 of 2025-26 | 365,413 | 76.7% | 4.5% |
| Period 9 of 2025-26 | 402,991 | 71.2% | 4.1% |
| Period 8 of 2025-26 | 402,825 | 74.0% | 3.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Wales & Western
| Route | Within 3 min | Cancelled |
|---|---|---|
| Wales | 79.0% | 3.2% |
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out