Anglia
Network Rail Eastern region
How this route is doing
Anglia is a Network Rail route in the Eastern region. In the 13 four-week periods to Period 7 of 2026-27 it handled 11,579,835 scheduled station stops, and 88.3% of recorded arrivals came within three minutes of the timetable while 3.5% of scheduled stops were cancelled.
Anglia ranks 3rd of 18 routes on 88.3% within three minutes, 4.7 percentage points above the national figure of 83.6%.
Cancellations on Anglia run higher than the national picture: 3.5% of scheduled stops against 3.2% for Great Britain, 0.3 percentage points more. That ranks 11th of 18 routes from the fewest.
Anglia has slipped a little, from 90.1% within three minutes in the previous 13 periods to 88.3% in the latest 13, a fall of 1.8 percentage points. Cancellations rose to 3.5% of scheduled stops from 2.5%, which is 1.0 percentage points more.
Over three full railway years Anglia has got worse each time, from 92.4% within three minutes in 2023-24 to 91.3% in 2024-25 and 89.7% in 2025-26.
Anglia is the most punctual route in Eastern, on 88.3%. The other routes in the region are East Coast (80.9%), East Midlands (76.8%) and North & East (77.9%).
The National Rail timetable for 26 November 2026 schedules 35,334 passenger calls at the stations grouped under Anglia, an average of 155 for each of the 227 that had a train. The busiest were London Liverpool Street (1,670 calls), Whitechapel (1,247 calls), Stratford (London) (1,135 calls) and Shenfield (616 calls).
On Anglia the busiest hour of that day began at 17:00, with 2,251 calls, 116 of them at London Liverpool Street. The first scheduled call of the service day is at Southend Victoria at 04:00 on a Greater Anglia train, and the last is at Huntingdon at 03:38 on a Thameslink train.
London Overground (33%), Greater Anglia (32%) and Elizabeth Line (13%) ran the most trains on Anglia, from 9 operators calling in all. The most frequent journey touching the route was Shenfield to London Paddington, with 132 Elizabeth Line trains.
Among the busiest stations, the longest wait between 06:00 and midnight was 8 minutes at Shenfield, between the 23:48 and the 23:56. Shippea Hill (1 calls), Berney Arms (3 calls) and Spooner Row (4 calls) had the fewest trains of any station grouped under Anglia. 6 of its stations had ten calls or fewer.
Of the 206 stations here with at least 1,500 scheduled stops in the ORR figures, Lingwood was the most punctual at 98.0% within three minutes and Watlington the least at 62.7%. Trains calling on Anglia most often carry on to stations on Kent (2,130 trains) and East Coast (1,717 trains).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 896,160 | 86.4% | 2.7% |
| Period 6 of 2026-27 | 865,397 | 82.9% | 4.7% |
| Period 5 of 2026-27 | 884,197 | 85.9% | 6.4% |
| Period 4 of 2026-27 | 887,761 | 86.6% | 5.6% |
| Period 3 of 2026-27 | 873,262 | 87.5% | 3.7% |
| Period 2 of 2026-27 | 890,200 | 89.9% | 4.0% |
| Period 1 of 2026-27 | 1,030,624 | 90.9% | 2.5% |
| Period 13 of 2025-26 | 945,782 | 90.7% | 2.2% |
| Period 12 of 2025-26 | 892,492 | 90.9% | 2.4% |
| Period 11 of 2025-26 | 886,702 | 90.4% | 2.3% |
| Period 10 of 2025-26 | 756,191 | 89.8% | 2.8% |
| Period 9 of 2025-26 | 881,531 | 87.1% | 3.4% |
| Period 8 of 2025-26 | 889,536 | 88.0% | 2.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Eastern
| Route | Within 3 min | Cancelled |
|---|---|---|
| East Coast | 80.9% | 4.4% |
| East Midlands | 76.8% | 4.7% |
| North & East | 77.9% | 2.5% |
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out