Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Kent

Network Rail Southern region

On time, last 13 periods84.7%Great Britain: 83.6%
Cancelled2.5%Great Britain: 3.2%
Scheduled stops10,345,474Last 13 periods

How this route is doing

Kent is a Network Rail route in the Southern region. In the 13 four-week periods to Period 7 of 2026-27 it handled 10,345,474 scheduled station stops, and 84.7% of recorded arrivals came within three minutes of the timetable while 2.5% of scheduled stops were cancelled.

Kent ranks 7th of 18 routes on 84.7% within three minutes, 1.1 percentage points above the national figure of 83.6%.

Cancellations on Kent run lower than the national picture: 2.5% of scheduled stops against 3.2% for Great Britain, 0.7 percentage points fewer. That ranks 6th of 18 routes from the fewest.

Kent has barely changed from one year to the next, with 84.7% within three minutes in the latest 13 periods against 85.0% in the 13 before, a difference of 0.3 percentage points. Cancellations fell to 2.5% of scheduled stops from 3.0%, which is 0.5 percentage points fewer.

Kent has not moved in one direction over three full railway years: 86.2% within three minutes in 2023-24, 85.1% in 2024-25 and 86.2% in 2025-26.

Kent is the most punctual route in Southern, on 84.7%. The other routes in the region are High Speed (79.6%), Sussex (83.7%) and Wessex (82.1%).

The National Rail timetable for 26 November 2026 schedules 32,560 passenger calls at the stations grouped under Kent, an average of 166 for each of the 195 that had a train. The busiest were London Bridge (1,824 calls), London Charing Cross (684 calls), Abbey Wood (575 calls) and Lewisham (519 calls).

On Kent the busiest hour of that day began at 18:00, with 2,087 calls, 116 of them at London Bridge. The first scheduled call of the service day is at Gillingham (Kent) at 04:06 on a Thameslink train, and the last is at Gillingham (Kent) at 02:03 on a Thameslink train.

Southeastern (65%), Thameslink (11%) and Elizabeth Line (8%) ran the most trains on Kent, from 8 operators calling in all. The most frequent journey touching the route was Shenfield to London Paddington, with 132 Elizabeth Line trains.

Among the busiest stations, the longest wait between 06:00 and midnight was 12 minutes at Orpington, between the 23:26 and the 23:38. Ham Street (36 calls), Ashurst (Kent) (37 calls) and Crowborough (38 calls) had the fewest trains of any station grouped under Kent.

Of the 192 stations here with at least 1,500 scheduled stops in the ORR figures, Sundridge Park was the most punctual at 99.4% within three minutes and Teynham the least at 67.8%. Trains calling on Kent most often carry on to stations on Anglia (2,130 trains) and Wessex (1,741 trains).

Period by period

70%80%90%2023-242024-252025-262026-27Period 1 of 2023-24: 89.4%Period 2 of 2023-24: 89.4%Period 3 of 2023-24: 85.6%Period 4 of 2023-24: 88.2%Period 5 of 2023-24: 89.3%Period 6 of 2023-24: 87.6%Period 7 of 2023-24: 85.7%Period 8 of 2023-24: 84.0%Period 9 of 2023-24: 81.2%Period 10 of 2023-24: 81.5%Period 11 of 2023-24: 83.4%Period 12 of 2023-24: 86.5%Period 13 of 2023-24: 88.2%Period 1 of 2024-25: 88.7%Period 2 of 2024-25: 88.6%Period 3 of 2024-25: 88.5%Period 4 of 2024-25: 86.1%Period 5 of 2024-25: 87.1%Period 6 of 2024-25: 87.2%Period 7 of 2024-25: 84.0%Period 8 of 2024-25: 81.9%Period 9 of 2024-25: 75.3%Period 10 of 2024-25: 82.8%Period 11 of 2024-25: 82.6%Period 12 of 2024-25: 85.9%Period 13 of 2024-25: 87.0%Period 1 of 2025-26: 89.1%Period 2 of 2025-26: 86.3%Period 3 of 2025-26: 88.3%Period 4 of 2025-26: 85.9%Period 5 of 2025-26: 87.3%Period 6 of 2025-26: 86.8%Period 7 of 2025-26: 84.7%Period 8 of 2025-26: 82.8%Period 9 of 2025-26: 81.6%Period 10 of 2025-26: 85.5%Period 11 of 2025-26: 86.7%Period 12 of 2025-26: 87.5%Period 13 of 2025-26: 88.3%Period 1 of 2026-27: 89.4%Period 2 of 2026-27: 85.6%Period 3 of 2026-27: 83.4%Period 4 of 2026-27: 86.0%Period 5 of 2026-27: 82.7%Period 6 of 2026-27: 79.5%Period 7 of 2026-27: 80.9%
This pageGreat Britain
0%2%4%6%Period 1 of 2023-24: 1.6%Period 2 of 2023-24: 1.5%Period 3 of 2023-24: 3.0%Period 4 of 2023-24: 1.9%Period 5 of 2023-24: 2.0%Period 6 of 2023-24: 1.8%Period 7 of 2023-24: 2.0%Period 8 of 2023-24: 2.7%Period 9 of 2023-24: 2.3%Period 10 of 2023-24: 4.7%Period 11 of 2023-24: 1.9%Period 12 of 2023-24: 2.4%Period 13 of 2023-24: 1.6%Period 1 of 2024-25: 2.0%Period 2 of 2024-25: 1.9%Period 3 of 2024-25: 2.2%Period 4 of 2024-25: 2.7%Period 5 of 2024-25: 2.6%Period 6 of 2024-25: 2.4%Period 7 of 2024-25: 3.3%Period 8 of 2024-25: 3.0%Period 9 of 2024-25: 4.1%Period 10 of 2024-25: 4.2%Period 11 of 2024-25: 2.7%Period 12 of 2024-25: 2.5%Period 13 of 2024-25: 2.8%Period 1 of 2025-26: 1.9%Period 2 of 2025-26: 2.3%Period 3 of 2025-26: 2.4%Period 4 of 2025-26: 3.0%Period 5 of 2025-26: 3.4%Period 6 of 2025-26: 3.4%Period 7 of 2025-26: 2.9%Period 8 of 2025-26: 2.2%Period 9 of 2025-26: 3.0%Period 10 of 2025-26: 2.8%Period 11 of 2025-26: 2.1%Period 12 of 2025-26: 2.0%Period 13 of 2025-26: 1.9%Period 1 of 2026-27: 1.9%Period 2 of 2026-27: 3.2%Period 3 of 2026-27: 3.4%Period 4 of 2026-27: 2.4%Period 5 of 2026-27: 3.3%Period 6 of 2026-27: 2.8%Period 7 of 2026-27: 2.1%2023-242024-252025-262026-27

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-27800,69580.9%2.1%
Period 6 of 2026-27792,95879.5%2.8%
Period 5 of 2026-27754,30082.7%3.3%
Period 4 of 2026-27809,75686.0%2.4%
Period 3 of 2026-27784,53983.4%3.4%
Period 2 of 2026-27768,41085.6%3.2%
Period 1 of 2026-27909,93989.4%1.9%
Period 13 of 2025-26878,49488.3%1.9%
Period 12 of 2025-26796,72987.5%2.0%
Period 11 of 2025-26794,37586.7%2.1%
Period 10 of 2025-26663,93485.5%2.8%
Period 9 of 2025-26799,17181.6%3.0%
Period 8 of 2025-26792,17482.8%2.2%

Time of year

75%80%85%90%95%P1: 89.2%1P2: 87.4%2P3: 86.5%3P4: 86.5%4P5: 86.6%5P6: 85.2%6P7: 83.8%7P8: 82.9%8P9: 79.3%9P10: 83.2%10P11: 84.3%11P12: 86.6%12P13: 87.8%13

Each point averages that period of the railway year over every year in the data. Period 1 starts in April.

Other routes in Southern

RouteWithin 3 minCancelled
High Speed79.6%1.8%
Sussex83.7%4.2%
Wessex82.1%3.8%

Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out