Skip to content

How punctual is your station? Every stop, every operator, every four weeks.

Chiltern Rail Ltd

Network Rail Non-Network Rail Infrastructure region

On time, last 13 periods86.1%Great Britain: 83.6%
Cancelled1.6%Great Britain: 3.2%
Scheduled stops51,666Last 13 periods

How this route is doing

Chiltern Rail Ltd is a Network Rail route in the Non-Network Rail Infrastructure region. In the 13 four-week periods to Period 7 of 2026-27 it handled 51,666 scheduled station stops, and 86.1% of recorded arrivals came within three minutes of the timetable while 1.6% of scheduled stops were cancelled.

Chiltern Rail Ltd ranks 6th of 18 routes on 86.1% within three minutes, 2.5 percentage points above the national figure of 83.6%.

Cancellations on Chiltern Rail Ltd run lower than the national picture: 1.6% of scheduled stops against 3.2% for Great Britain, 1.6 percentage points fewer. That ranks 2nd of 18 routes from the fewest.

Other routes in Non-Network Rail Infrastructure are Non-Network Rail Infrastructure (Private Railway) (92.2%), Non-Network Rail Infrastructure (TfW Cardiff Valleys) (93.3%) and Non-Network Rail Infrastructure (The Chiltern Railway Co Ltd) (86.4%), set against 86.1% for Chiltern Rail Ltd.

Period by period

75%80%85%90%95%2023-242024-252025-262026-27Period 1 of 2026-27: 89.9%Period 2 of 2026-27: 88.1%Period 3 of 2026-27: 85.3%Period 4 of 2026-27: 85.4%Period 5 of 2026-27: 87.3%Period 6 of 2026-27: 86.3%Period 7 of 2026-27: 82.1%
This pageGreat Britain
0%2%4%6%Period 1 of 2026-27: 0.8%Period 2 of 2026-27: 0.7%Period 3 of 2026-27: 2.1%Period 4 of 2026-27: 0.7%Period 5 of 2026-27: 1.3%Period 6 of 2026-27: 4.3%Period 7 of 2026-27: 1.5%2023-242024-252025-262026-27

The last 13 periods

PeriodScheduled stopsWithin 3 minCancelled
Period 7 of 2026-277,74382.1%1.5%
Period 6 of 2026-277,93086.3%4.3%
Period 5 of 2026-277,71187.3%1.3%
Period 4 of 2026-277,66785.4%0.7%
Period 3 of 2026-276,21485.3%2.1%
Period 2 of 2026-277,13888.1%0.7%
Period 1 of 2026-277,26389.9%0.8%
Period 13 of 2025-260––
Period 12 of 2025-260––
Period 11 of 2025-260––
Period 10 of 2025-260––
Period 9 of 2025-260––
Period 8 of 2025-260––

Other routes in Non-Network Rail Infrastructure

Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.

On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out