High Speed
Network Rail Southern region
How this route is doing
High Speed is a Network Rail route in the Southern region. In the 13 four-week periods to Period 7 of 2026-27 it handled 148,727 scheduled station stops, and 79.6% of recorded arrivals came within three minutes of the timetable while 1.8% of scheduled stops were cancelled.
High Speed ranks 13th of 18 routes on 79.6% within three minutes, 4.0 percentage points below the national figure of 83.6%.
Cancellations on High Speed run lower than the national picture: 1.8% of scheduled stops against 3.2% for Great Britain, 1.4 percentage points fewer. That ranks 4th of 18 routes from the fewest.
High Speed has slipped sharply. 79.6% of stops came within three minutes of the timetable in the latest 13 periods, 5.7 percentage points worse than the 85.3% recorded in the 13 before. Cancellations held steady at 1.8% of scheduled stops, against 1.8% before.
Over three full railway years High Speed has got worse each time, from 86.4% within three minutes in 2023-24 to 85.0% in 2024-25 and 84.8% in 2025-26.
Other routes in Southern are Kent (84.7%), Sussex (83.7%) and Wessex (82.1%), set against 79.6% for High Speed.
The National Rail timetable for 26 November 2026 schedules 1,284 passenger calls at the stations grouped under High Speed, an average of 428 for each of the 3 that had a train. The busiest were London St Pancras International (982 calls), Stratford International (155 calls) and Ebbsfleet International (147 calls).
On High Speed the busiest hour of that day began at 08:00, with 87 calls, 67 of them at London St Pancras International. The first scheduled call of the service day is at London St Pancras International at 04:32 on a Thameslink train, and the last is at London St Pancras International at 03:44 on a Thameslink train.
Thameslink (45%), Southeastern (35%) and East Midlands Railway (16%) ran the most trains on High Speed, from 5 operators calling in all. The most frequent journey touching the route was St Albans to Sutton (London), with 66 Thameslink trains.
Among the busiest stations, the longest wait between 06:00 and midnight was 27 minutes at Ebbsfleet International, between the 22:59 and the 23:26. Ebbsfleet International (147 calls), Stratford International (155 calls) and London St Pancras International (982 calls) had the fewest trains of any station grouped under High Speed.
Trains calling on High Speed most often carry on to stations on East Coast (563 trains) and Kent (559 trains).
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 11,571 | 75.0% | 1.6% |
| Period 6 of 2026-27 | 11,400 | 71.5% | 3.6% |
| Period 5 of 2026-27 | 11,596 | 72.1% | 1.8% |
| Period 4 of 2026-27 | 11,600 | 76.4% | 1.8% |
| Period 3 of 2026-27 | 11,506 | 70.4% | 2.4% |
| Period 2 of 2026-27 | 11,295 | 76.5% | 3.2% |
| Period 1 of 2026-27 | 12,850 | 86.2% | 0.9% |
| Period 13 of 2025-26 | 12,621 | 85.1% | 2.1% |
| Period 12 of 2025-26 | 11,333 | 85.7% | 0.7% |
| Period 11 of 2025-26 | 11,452 | 87.0% | 1.1% |
| Period 10 of 2025-26 | 9,409 | 84.1% | 1.1% |
| Period 9 of 2025-26 | 10,993 | 83.3% | 0.7% |
| Period 8 of 2025-26 | 11,101 | 81.1% | 1.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other routes in Southern
Route figures cover every operator calling at stations on the route and come from a separate table in the same ORR release. The ORR publishes no list of stations by route, so each station is grouped with the nearest of a set of reference stations on each route, or by country for Scotland and Wales; stations near a boundary can fall on the neighbouring route.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out