Coventry
COVWest MidlandsManaged by Avanti West Coast
How this station is performing
Coventry had 80,823 scheduled stops to Period 7 of 2026-27, about 222 a day. 62.5% of recorded arrivals were within three minutes of the timetable and 5.8% of scheduled stops were cancelled.
Coventry opened on 9 April 1838, 188 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Coventry is the oldest; the next oldest, Kenilworth, dates from 1844.
The nearest stations to Coventry are Canley (2.3 km west), Coventry Arena (5.3 km north), Tile Hill (5.7 km west), Kenilworth (7.6 km south-west) and Berkswell (8.7 km west). 6 stations lie within 10 km in all. At 62.5%, Coventry is less punctual than all of them; the best of the five, Coventry Arena, manages 85.9%.
Coventry takes its name from a big city called Coventry, home to about 362,690 people, and the station stands 1.8 km from its centre.
3 operators call at Coventry: West Midlands Railway (71.7%, 48% of stops), Avanti (53.5%, 38% of stops) and CrossCountry (54.6%, 14% of stops). The operator you travel with matters: West Midlands Railway reaches 71.7% within three minutes while Avanti manages 53.5%, a gap of 18.2 percentage points.
2 of 3 stations of a similar size in West Midlands are more punctual than Coventry on 62.5%. The comparison group includes Stoke-on-Trent (62.2%), University (Birmingham) (76.4%) and Smethwick Galton Bridge (80.2%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| West Midlands Railway | 38,897 | 71.7% | 4.7% |
| Avanti | 30,379 | 53.5% | 7.7% |
| CrossCountry | 11,547 | 54.6% | 4.8% |
Operators with their own page for this station are linked to it.
Late train at Coventry? Delay Repay
These operators call at Coventry and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 6,351 | 59.4% | 4.3% |
| Period 6 of 2026-27 | 6,380 | 54.2% | 6.1% |
| Period 5 of 2026-27 | 6,109 | 59.3% | 7.5% |
| Period 4 of 2026-27 | 6,110 | 55.7% | 9.8% |
| Period 3 of 2026-27 | 5,480 | 60.5% | 4.7% |
| Period 2 of 2026-27 | 5,908 | 62.7% | 7.5% |
| Period 1 of 2026-27 | 7,034 | 69.0% | 4.0% |
| Period 13 of 2025-26 | 7,052 | 72.2% | 3.9% |
| Period 12 of 2025-26 | 6,469 | 70.3% | 4.0% |
| Period 11 of 2025-26 | 6,250 | 68.3% | 6.1% |
| Period 10 of 2025-26 | 5,457 | 61.3% | 7.3% |
| Period 9 of 2025-26 | 6,468 | 56.5% | 6.6% |
| Period 8 of 2025-26 | 5,755 | 60.0% | 4.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in West Midlands
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Stoke-on-Trent | 76,035 | 62.2% | 5.0% |
| University (Birmingham) | 72,839 | 76.4% | 4.0% |
| Smethwick Galton Bridge | 90,011 | 80.2% | 3.6% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out