Caldicot
CDTWalesManaged by TfW Rail
How this station is performing
Caldicot had 12,359 scheduled stops to Period 7 of 2026-27, about 34 a day. 70.8% of recorded arrivals were within three minutes of the timetable and 5.2% of scheduled stops were cancelled.
Caldicot opened on 12 September 1932, 94 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Caldicot is the newest; the oldest, Chepstow, opened in 1850.
The nearest stations to Caldicot are Severn Tunnel Junction (1.2 km west), Severn Beach (7.1 km east), Chepstow (8.7 km north-east), St Andrews Road (9.1 km south-east) and Pilning (9.7 km east). 5 stations lie within 10 km in all. At 70.8%, Caldicot is less punctual than all of them; the best of the five, Severn Beach, manages 79.1%.
Caldicot takes its name from a town called Caldicot, home to about 9,815 people, and the station stands 1.0 km from its centre.
2 operators call at Caldicot: Transport for Wales (69.5%, 86% of stops) and CrossCountry (80.4%, 14% of stops). The operator you travel with matters: CrossCountry reaches 80.4% within three minutes while Transport for Wales manages 69.5%, a gap of 10.9 percentage points.
Compared with 3 stations of a similar size in Wales, Caldicot is the least punctual, at 70.8%. All of them are ahead, including Tir-Phil (88.9%), Brithdir (89.4%) and Pontlottyn (91.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Transport for Wales | 10,599 | 69.5% | 3.4% |
| CrossCountry | 1,760 | 80.4% | 16.1% |
Operators with their own page for this station are linked to it.
Late train at Caldicot? Delay Repay
These operators call at Caldicot and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 959 | 64.2% | 5.6% |
| Period 6 of 2026-27 | 891 | 65.8% | 9.2% |
| Period 5 of 2026-27 | 794 | 65.4% | 13.6% |
| Period 4 of 2026-27 | 843 | 67.3% | 6.6% |
| Period 3 of 2026-27 | 961 | 72.7% | 4.0% |
| Period 2 of 2026-27 | 976 | 67.3% | 6.7% |
| Period 1 of 2026-27 | 1,120 | 76.5% | 2.0% |
| Period 13 of 2025-26 | 1,059 | 75.9% | 2.4% |
| Period 12 of 2025-26 | 977 | 78.1% | 2.5% |
| Period 11 of 2025-26 | 963 | 82.8% | 2.8% |
| Period 10 of 2025-26 | 874 | 67.6% | 5.8% |
| Period 9 of 2025-26 | 979 | 62.6% | 7.3% |
| Period 8 of 2025-26 | 963 | 69.4% | 2.4% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Wales
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Tir-Phil | 12,343 | 88.9% | 3.1% |
| Brithdir | 12,342 | 89.4% | 3.1% |
| Pontlottyn | 12,342 | 91.3% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out