Cheltenham Spa
CNMSouth WestManaged by Great Western Railway
How this station is performing
Cheltenham Spa had 63,029 scheduled stops to Period 7 of 2026-27, about 173 a day. 64.0% of recorded arrivals were within three minutes of the timetable and 6.4% of scheduled stops were cancelled.
Cheltenham Spa opened on 24 June 1840, 186 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Cheltenham Spa is the oldest; the next oldest, Gloucester, dates from 1840.
Cheltenham Spa is remote: its nearest neighbours are Gloucester (10.1 km west), Ashchurch for Tewkesbury (11.4 km north), Stroud (Gloucs) (18.8 km south-west), Stonehouse (20.8 km south-west) and Evesham (24.8 km north-east). Of the five, Stonehouse is the most punctual at 73.0% and Evesham the least at 58.0%, with Cheltenham Spa on 64.0%.
Cheltenham Spa is named after Cheltenham, a big city, home to about 116,447 people, but the station stands 1.5 km from its centre.
3 operators call at Cheltenham Spa: CrossCountry (60.3%, 48% of stops), Great Western Railway (66.7%, 36% of stops) and Transport for Wales (69.1%, 15% of stops). The operator you travel with matters: Transport for Wales reaches 69.1% within three minutes while CrossCountry manages 60.3%, a gap of 8.8 percentage points.
2 of 3 stations of a similar size in South West are more punctual than Cheltenham Spa on 64.0%. The comparison group includes Swindon (Wilts) (63.3%), Bristol Parkway (66.2%) and Newton Abbot (71.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| CrossCountry | 30,538 | 60.3% | 6.8% |
| Great Western Railway | 22,770 | 66.7% | 5.3% |
| Transport for Wales | 9,721 | 69.1% | 7.8% |
Operators with their own page for this station are linked to it.
Late train at Cheltenham Spa? Delay Repay
These operators call at Cheltenham Spa and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,179 | 52.6% | 6.5% |
| Period 6 of 2026-27 | 4,866 | 58.2% | 9.1% |
| Period 5 of 2026-27 | 4,679 | 55.5% | 9.0% |
| Period 4 of 2026-27 | 4,804 | 59.3% | 7.6% |
| Period 3 of 2026-27 | 4,814 | 63.7% | 7.3% |
| Period 2 of 2026-27 | 4,948 | 64.7% | 6.8% |
| Period 1 of 2026-27 | 5,498 | 71.4% | 3.3% |
| Period 13 of 2025-26 | 5,464 | 69.3% | 3.4% |
| Period 12 of 2025-26 | 4,966 | 74.4% | 3.8% |
| Period 11 of 2025-26 | 4,895 | 75.7% | 4.3% |
| Period 10 of 2025-26 | 4,434 | 66.1% | 9.4% |
| Period 9 of 2025-26 | 4,818 | 53.5% | 8.9% |
| Period 8 of 2025-26 | 4,664 | 61.6% | 5.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South West
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Swindon (Wilts) | 64,033 | 63.3% | 3.6% |
| Bristol Parkway | 64,046 | 66.2% | 4.5% |
| Newton Abbot | 58,484 | 71.8% | 4.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out