Chesterfield
CHDEast MidlandsManaged by East Midlands Railway
How this station is performing
Chesterfield had 60,303 scheduled stops to Period 7 of 2026-27, about 166 a day. 63.7% of recorded arrivals were within three minutes of the timetable and 3.4% of scheduled stops were cancelled.
Chesterfield opened on 11 May 1840. It was moved to the site it uses now on 2 May 1870. Of the 5 stations nearest to it with a known opening date, Chesterfield is the oldest; the next oldest, Matlock, dates from 1849.
The nearest stations to Chesterfield are Dronfield (7.7 km north-west), Dore and Totley (11.8 km north-west), Creswell (13.9 km east), Langwith-Whaley Thorns (14.1 km east) and Matlock (14.5 km south-west). 1 stations lie within 10 km in all. At 63.7%, Chesterfield is less punctual than all of them; the best of the five, Matlock, manages 85.4%.
Chesterfield is one of 2 stations named after a market town called Chesterfield, home to about 76,402 people; this one stands 0.6 km from its centre.
3 operators call at Chesterfield: East Midlands Railway (61.3%, 59% of stops), Northern (79.1%, 21% of stops) and CrossCountry (54.2%, 20% of stops). The operator you travel with matters: Northern reaches 79.1% within three minutes while CrossCountry manages 54.2%, a gap of 24.9 percentage points.
Compared with 3 stations of a similar size in East Midlands, Chesterfield is the least punctual, at 63.7%. All of them are ahead, including Beeston (78.0%), Grantham (64.8%) and Lincoln (87.8%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| East Midlands Railway | 35,468 | 61.3% | 4.3% |
| Northern | 12,853 | 79.1% | 1.9% |
| CrossCountry | 11,982 | 54.2% | 2.6% |
Operators with their own page for this station are linked to it.
Late train at Chesterfield? Delay Repay
These operators call at Chesterfield and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,610 | 65.2% | 2.7% |
| Period 6 of 2026-27 | 4,469 | 61.2% | 3.3% |
| Period 5 of 2026-27 | 4,165 | 60.9% | 3.8% |
| Period 4 of 2026-27 | 4,502 | 61.1% | 5.7% |
| Period 3 of 2026-27 | 4,375 | 57.1% | 5.5% |
| Period 2 of 2026-27 | 4,694 | 59.1% | 4.1% |
| Period 1 of 2026-27 | 5,398 | 66.8% | 2.6% |
| Period 13 of 2025-26 | 5,063 | 63.6% | 3.6% |
| Period 12 of 2025-26 | 4,667 | 68.7% | 2.8% |
| Period 11 of 2025-26 | 4,725 | 73.5% | 3.0% |
| Period 10 of 2025-26 | 4,275 | 66.8% | 3.1% |
| Period 9 of 2025-26 | 4,680 | 58.3% | 3.1% |
| Period 8 of 2025-26 | 4,680 | 64.6% | 1.7% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East Midlands
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out