Ulleskelf
ULLYorkshire and The HumberManaged by Northern Trains
How this station is performing
Ulleskelf has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 6,031 scheduled stops, about 17 a day. In those periods 80.0% of stops arrived within three minutes of the timetable and 2.5% of scheduled stops were cancelled.
Ulleskelf opened on 30 May 1839, 187 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, South Milford is the oldest (1834) and East Garforth the newest (1987), with Ulleskelf in between.
The nearest stations to Ulleskelf are Church Fenton (3.0 km south), Sherburn-in-Elmet (6.3 km south), South Milford (8.2 km south), Micklefield (10.3 km south-west) and East Garforth (12.4 km south-west). 3 stations lie within 10 km in all. Of the five, Sherburn-in-Elmet is the most punctual at 81.0% and South Milford the least at 64.9%, with Ulleskelf on 80.0%.
Ulleskelf takes its name from a Village called Ulleskelf, home to about 1,221 people, and the station stands 0.2 km from its centre.
1 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Ulleskelf on 80.0%. The comparison group includes Horton-in-Ribblesdale (77.5%), Ribblehead (75.8%) and Crowle (84.1%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,031 | 80.0% | 2.5% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 472 | 79.3% | 0.8% |
| Period 6 of 2026-27 | 460 | 84.6% | 1.3% |
| Period 5 of 2026-27 | 494 | 83.0% | 3.6% |
| Period 4 of 2026-27 | 505 | 77.1% | 4.0% |
| Period 3 of 2026-27 | 490 | 83.4% | 2.7% |
| Period 2 of 2026-27 | 477 | 78.2% | 2.9% |
| Period 1 of 2026-27 | 572 | 88.1% | 1.6% |
| Period 13 of 2025-26 | 551 | 85.4% | 2.0% |
| Period 12 of 2025-26 | 460 | 82.4% | 2.4% |
| Period 11 of 2025-26 | 383 | – | 3.7% |
| Period 10 of 2025-26 | 314 | 75.9% | 4.8% |
| Period 9 of 2025-26 | 457 | 68.4% | 1.8% |
| Period 8 of 2025-26 | 396 | 69.0% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Horton-in-Ribblesdale | 5,864 | 77.5% | 1.0% |
| Ribblehead | 6,438 | 75.8% | 1.0% |
| Crowle | 5,649 | 84.1% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out