Crowle
CWEYorkshire and The HumberManaged by Northern Trains
How this station is performing
Crowle had 5,649 scheduled stops to Period 7 of 2026-27, about 16 a day. 84.1% of recorded arrivals were within three minutes of the timetable and 1.5% of scheduled stops were cancelled.
Crowle opened on 13 September 1859, 167 years before the latest figures here, and has not been moved since. Among the 5 stations nearest to it with a known opening date, Thorne South is the oldest (1856) and Goole the newest (1869), with Crowle in between.
The nearest stations to Crowle are Althorpe (5.6 km east), Thorne South (9.2 km west), Thorne North (10.6 km west), Scunthorpe (11.0 km east) and Goole (13.4 km north). 2 stations lie within 10 km in all. Of the five, Althorpe is the most punctual at 84.5% and Goole the least at 75.8%, with Crowle on 84.1%.
Crowle is one of 2 stations named after a town called Crowle, home to about 4,828 people; this one stands 2.2 km from its centre.
2 operators call at Crowle: Northern (87.2%, 89% of stops) and TransPennine Express (62.5%, 11% of stops). The operator you travel with matters: Northern reaches 87.2% within three minutes while TransPennine Express manages 62.5%, a gap of 24.7 percentage points.
2 of 3 stations of a similar size in Yorkshire and The Humber are more punctual than Crowle on 84.1%. The comparison group includes Althorpe (84.5%), Thorne South (84.4%) and Saltmarshe (79.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,036 | 87.2% | 1.3% |
| TransPennine Express | 613 | 62.5% | 0.0% |
Operators with their own page for this station are linked to it.
Late train at Crowle? Delay Repay
These operators call at Crowle and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 432 | 85.3% | 1.4% |
| Period 6 of 2026-27 | 432 | 85.5% | 1.9% |
| Period 5 of 2026-27 | 430 | 84.8% | 0.7% |
| Period 4 of 2026-27 | 432 | 83.3% | 4.6% |
| Period 3 of 2026-27 | 431 | 87.1% | 0.9% |
| Period 2 of 2026-27 | 403 | 84.7% | 3.0% |
| Period 1 of 2026-27 | 504 | 88.2% | 1.2% |
| Period 13 of 2025-26 | 467 | 87.9% | 1.1% |
| Period 12 of 2025-26 | 432 | 85.2% | 0.9% |
| Period 11 of 2025-26 | 432 | 83.1% | 0.9% |
| Period 10 of 2025-26 | 389 | 81.2% | 1.0% |
| Period 9 of 2025-26 | 432 | 78.1% | 0.2% |
| Period 8 of 2025-26 | 433 | 77.7% | 1.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Althorpe | 5,647 | 84.5% | 1.5% |
| Thorne South | 5,647 | 84.4% | 1.5% |
| Saltmarshe | 5,538 | 79.3% | 3.4% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out