Horton-in-Ribblesdale
HIRYorkshire and The HumberManaged by Northern Trains
How this station is performing
Horton-in-Ribblesdale has usable figures for 12 of the last 13 four-week periods to Period 7 of 2026-27, covering 5,864 scheduled stops, about 16 a day. In those periods 77.5% of stops arrived within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Horton-in-Ribblesdale opened on 1 May 1876 and closed to passengers on 4 May 1970. It reopened on 14 July 1986, 40 years before the latest figures. Of the 5 stations nearest to it with a known opening date, Horton-in-Ribblesdale is the newest; the oldest, Clapham (North Yorkshire), opened in 1849.
The nearest stations to Horton-in-Ribblesdale are Ribblehead (7.3 km north-west), Clapham (North Yorkshire) (8.6 km south-west), Settle (9.3 km south), Giggleswick (9.7 km south) and Bentham (14.1 km west). 4 stations lie within 10 km in all. Of the five, Giggleswick is the most punctual at 82.2% and Ribblehead the least at 75.8%, with Horton-in-Ribblesdale on 77.5%.
Horton-in-Ribblesdale is named after Horton in Ribblesdale, a Village, home to about 498 people, but the station stands 0.4 km from its centre.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Horton-in-Ribblesdale is the least punctual, at 77.5%. All of them are ahead, including Ulleskelf (80.0%), Crowle (84.1%) and Althorpe (84.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 5,864 | 77.5% | 1.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 448 | 75.5% | 0.4% |
| Period 6 of 2026-27 | 448 | 81.7% | 0.0% |
| Period 5 of 2026-27 | 448 | 81.4% | 0.7% |
| Period 4 of 2026-27 | 448 | 79.7% | 1.3% |
| Period 3 of 2026-27 | 448 | 77.6% | 0.4% |
| Period 2 of 2026-27 | 448 | 73.4% | 2.7% |
| Period 1 of 2026-27 | 517 | – | 0.6% |
| Period 13 of 2025-26 | 491 | 84.2% | 0.0% |
| Period 12 of 2025-26 | 448 | 84.0% | 2.5% |
| Period 11 of 2025-26 | 448 | 81.7% | 1.3% |
| Period 10 of 2025-26 | 384 | 75.2% | 0.5% |
| Period 9 of 2025-26 | 448 | 71.5% | 2.0% |
| Period 8 of 2025-26 | 440 | 62.8% | 0.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out