Northern at Ulleskelf
All trains at UlleskelfNorthern across BritainYorkshire and The Humber
How this operator is doing here
Northern had 6,031 scheduled stops at Ulleskelf in the 13 periods to Period 7 of 2026-27, 100% of the station's total. 80.0% of recorded arrivals came within three minutes and 2.5% of stops were cancelled.
Northern trains at Ulleskelf also serve Church Fenton (3.0 km south, 74.3% on time, 3.1% cancelled), Sherburn-in-Elmet (6.3 km south, 81.0% on time, 2.2% cancelled), South Milford (8.2 km south, 64.6% on time, 2.5% cancelled), Micklefield (10.3 km south-west, 66.0% on time, 2.4% cancelled), East Garforth (12.4 km south-west, 70.5% on time, 2.3% cancelled) and Selby (12.6 km south-east, 75.0% on time, 2.1% cancelled), which are the stations on its network closest to Ulleskelf.
Within 30 km of here, Northern runs best at Woodlesford, 18.5 km south-west (85.4%), and worst at South Milford, 8.2 km south (64.6%).
The busiest Northern station within 30 km of Ulleskelf is Leeds, 22.9 km west, with about 780 scheduled stops a day.
Of the 1 operators with enough records at Ulleskelf, Northern is the most punctual, at 80.0%.
For Northern, Ulleskelf is the 244th best of 493 ranked stations. Its 80.0% here is 1.4 percentage points above the 78.6% across the whole network.
Cancellations of Northern at Ulleskelf are near its usual level: 2.5% of scheduled stops, against 2.8% across its network and 2.5% for every operator at the station.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 472 | 79.3% | 0.8% |
| Period 6 of 2026-27 | 460 | 84.6% | 1.3% |
| Period 5 of 2026-27 | 494 | 83.0% | 3.6% |
| Period 4 of 2026-27 | 505 | 77.1% | 4.0% |
| Period 3 of 2026-27 | 490 | 83.4% | 2.7% |
| Period 2 of 2026-27 | 477 | 78.2% | 2.9% |
| Period 1 of 2026-27 | 572 | 88.1% | 1.6% |
| Period 13 of 2025-26 | 551 | 85.4% | 2.0% |
| Period 12 of 2025-26 | 460 | 82.4% | 2.4% |
| Period 11 of 2025-26 | 383 | – | 3.7% |
| Period 10 of 2025-26 | 314 | 75.9% | 4.8% |
| Period 9 of 2025-26 | 457 | 68.4% | 1.8% |
| Period 8 of 2025-26 | 396 | 69.0% | 1.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out