Ribblehead
RHDYorkshire and The HumberManaged by Northern Trains
How this station is performing
Ribblehead had 6,438 scheduled stops to Period 7 of 2026-27, about 18 a day. 75.8% of recorded arrivals were within three minutes of the timetable and 1.0% of scheduled stops were cancelled.
Ribblehead opened on 4 December 1876 and closed to passengers on 4 May 1970. It reopened on 14 July 1986, 40 years before the latest figures. Among the 5 stations nearest to it with a known opening date, Clapham (North Yorkshire) is the oldest (1849) and Dent the newest (1877), with Ribblehead in between.
The nearest stations to Ribblehead are Horton-in-Ribblesdale (7.3 km south-east), Dent (8.5 km north), Clapham (North Yorkshire) (11.6 km south), Garsdale (13.1 km north) and Bentham (14.0 km south-west). 2 stations lie within 10 km in all. At 75.8%, Ribblehead is less punctual than all of them; the best of the five, Bentham, manages 82.1%.
Across the whole run of data, the weakest four-week period for Ribblehead was Period 8 of 2024-25, at 55.0%, some time before the latest year. The strongest was Period 13 of 2024-25, at 87.7%, and the two are 32.7 percentage points apart. Cancellations peaked at 6.0% of scheduled stops in Period 11 of 2023-24, against 1.0% over the latest 13 periods.
Compared with 3 stations of a similar size in Yorkshire and The Humber, Ribblehead is the least punctual, at 75.8%. All of them are ahead, including Settle (76.4%), Ulleskelf (80.0%) and Horton-in-Ribblesdale (77.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Northern | 6,438 | 75.8% | 1.0% |
Operators with their own page for this station are linked to it.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 496 | 74.4% | 0.4% |
| Period 6 of 2026-27 | 496 | 77.3% | 0.0% |
| Period 5 of 2026-27 | 496 | 77.6% | 0.6% |
| Period 4 of 2026-27 | 496 | 75.8% | 1.4% |
| Period 3 of 2026-27 | 496 | 73.4% | 0.4% |
| Period 2 of 2026-27 | 496 | 74.0% | 3.0% |
| Period 1 of 2026-27 | 573 | 77.5% | 0.5% |
| Period 13 of 2025-26 | 543 | 82.9% | 0.0% |
| Period 12 of 2025-26 | 496 | 82.3% | 2.4% |
| Period 11 of 2025-26 | 496 | 80.2% | 1.2% |
| Period 10 of 2025-26 | 418 | 74.9% | 0.5% |
| Period 9 of 2025-26 | 472 | 70.5% | 1.9% |
| Period 8 of 2025-26 | 464 | 61.4% | 0.9% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in Yorkshire and The Humber
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Settle | 6,544 | 76.4% | 1.0% |
| Ulleskelf | 6,031 | 80.0% | 2.5% |
| Horton-in-Ribblesdale | 5,864 | 77.5% | 1.0% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out