Great Western Railway at Twyford
All trains at TwyfordGreat Western Railway across BritainSouth East
How this operator is doing here
Great Western Railway had 51,537 scheduled stops at Twyford in the 13 periods to Period 7 of 2026-27, 61% of the station's total. 86.9% of recorded arrivals came within three minutes and 3.2% of stops were cancelled.
Great Western Railway trains at Twyford also serve Wargrave (2.7 km north, 98.0% on time, 1.0% cancelled), Shiplake (4.2 km north, 97.9% on time, 1.0% cancelled), Winnersh (5.1 km south, – on time, – cancelled), Henley-on-Thames (7.0 km north, 98.1% on time, 1.0% cancelled), Wokingham (7.2 km south, 85.5% on time, 5.7% cancelled) and Reading (7.8 km west, 72.2% on time, 3.7% cancelled), which are the stations on its network closest to Twyford.
Within 30 km of here, Great Western Railway runs best at Windsor and Eton Central, 17.5 km east (99.0%), and worst at Reading, 7.8 km west (72.2%).
The busiest Great Western Railway station within 30 km of Twyford is Reading, 7.8 km west, with about 546 scheduled stops a day.
Of the 2 operators with enough records at Twyford, Great Western Railway is the most punctual, at 86.9%.
For Great Western Railway, Twyford is the 20th best of 210 ranked stations. Its 86.9% here is 11.2 percentage points above the 75.7% across the whole network.
Period by period
See how Great Western Railway Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 4,027 | 86.5% | 1.8% |
| Period 6 of 2026-27 | 3,535 | 85.7% | 3.9% |
| Period 5 of 2026-27 | 3,903 | 85.2% | 4.9% |
| Period 4 of 2026-27 | 3,759 | 85.0% | 3.0% |
| Period 3 of 2026-27 | 3,791 | 88.3% | 4.5% |
| Period 2 of 2026-27 | 3,937 | 88.2% | 3.4% |
| Period 1 of 2026-27 | 4,636 | 88.2% | 3.2% |
| Period 13 of 2025-26 | 4,420 | 88.9% | 1.4% |
| Period 12 of 2025-26 | 4,028 | 86.9% | 2.2% |
| Period 11 of 2025-26 | 4,032 | 89.2% | 3.7% |
| Period 10 of 2025-26 | 3,415 | 86.6% | 3.5% |
| Period 9 of 2025-26 | 4,028 | 84.1% | 2.7% |
| Period 8 of 2025-26 | 4,026 | 85.9% | 3.5% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Twyford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Elizabeth line | 32,423 | 82.7% | 4.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out