Staines
SNSSouth EastManaged by South Western Railway
How this station is performing
Staines had 80,459 scheduled stops to Period 7 of 2026-27, about 221 a day. 88.7% of recorded arrivals were within three minutes of the timetable and 2.1% of scheduled stops were cancelled.
Staines opened on 22 August 1848, 178 years before the latest figures here, and has not been moved since. Of the 5 stations nearest to it with a known opening date, Staines is the oldest; the next oldest, Ashford (Surrey), dates from 1848.
The nearest stations to Staines are Ashford (Surrey) (2.4 km east), Egham (3.0 km west), Wraysbury (3.9 km north-west), Heathrow Terminal 5 (Rail Station Only) (4.6 km north) and Heathrow Terminal 4 (Rail Station Only) (4.9 km north-east). 28 stations lie within 10 km in all. Of the five, Wraysbury is the most punctual at 91.9% and Egham the least at 87.2%, with Staines on 88.7%.
Staines is named after Staines-upon-Thames, a market town, home to about 18,484 people, but the station stands 0.6 km from its centre.
Staines has edged up: 88.7% of stops came within three minutes of the timetable in the latest 13 periods, 4.3 percentage points better than the 84.4% of the 13 before. Cancellations fell to 2.1% of scheduled stops from 2.8%, which is 0.7 percentage points fewer.
Compared with 3 stations of a similar size in South East, Staines is the most punctual, at 88.7%. The comparison group includes Epsom (Surrey) (86.7%), Horsham (72.6%) and Twyford (85.3%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| South Western Railway | 80,459 | 88.7% | 2.1% |
Operators with their own page for this station are linked to it.
Late train at Staines? Delay Repay
These operators call at Staines and publish Delay Repay rules.
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,288 | 91.0% | 1.1% |
| Period 6 of 2026-27 | 6,231 | 90.0% | 2.3% |
| Period 5 of 2026-27 | 6,234 | 89.1% | 1.7% |
| Period 4 of 2026-27 | 6,235 | 89.7% | 1.9% |
| Period 3 of 2026-27 | 6,139 | 88.3% | 1.9% |
| Period 2 of 2026-27 | 6,252 | 89.2% | 5.0% |
| Period 1 of 2026-27 | 6,847 | 92.2% | 2.1% |
| Period 13 of 2025-26 | 6,709 | 90.3% | 1.1% |
| Period 12 of 2025-26 | 6,256 | 91.0% | 2.2% |
| Period 11 of 2025-26 | 6,239 | 89.4% | 0.9% |
| Period 10 of 2025-26 | 5,689 | 89.4% | 1.9% |
| Period 9 of 2025-26 | 6,090 | 82.0% | 1.5% |
| Period 8 of 2025-26 | 6,250 | 81.3% | 3.6% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in South East
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Epsom (Surrey) | 77,622 | 86.7% | 2.8% |
| Horsham | 77,338 | 72.6% | 3.8% |
| Twyford | 83,960 | 85.3% | 3.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out