Elizabeth line at Twyford
All trains at TwyfordElizabeth line across BritainSouth East
How this operator is doing here
Elizabeth line had 32,423 scheduled stops at Twyford in the 13 periods to Period 7 of 2026-27, 39% of the station's total. 82.7% of recorded arrivals came within three minutes and 4.1% of stops were cancelled.
Elizabeth line trains at Twyford also serve Reading (7.8 km west, 84.3% on time, 3.7% cancelled), Maidenhead (10.9 km north-east, 84.7% on time, 4.0% cancelled), Taplow (13.7 km north-east, 83.1% on time, 3.7% cancelled), Burnham (Buckinghamshire) (15.9 km east, 85.9% on time, 4.4% cancelled), Slough (19.2 km east, 84.3% on time, 3.9% cancelled) and Langley (Berks) (22.6 km east, 84.7% on time, 4.1% cancelled), which are the stations on its network closest to Twyford.
Within 30 km of here, Elizabeth line runs best at Heathrow Terminal 4 (Rail Station Only), 29.0 km east (91.1%), and worst at Taplow, 13.7 km north-east (83.1%).
The busiest Elizabeth line station within 30 km of Twyford is Heathrow Terminals 2 and 3 (Rail Station Only), 28.3 km east, with about 212 scheduled stops a day.
Of the 2 operators with enough records at Twyford, Elizabeth line is the least punctual, at 82.7%.
Twyford is the least punctual station on the Elizabeth line network, out of 41 ranked stations: 82.7% here against 89.6% across the whole network, which is 6.9 percentage points worse.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 2,502 | 82.2% | 4.3% |
| Period 6 of 2026-27 | 2,265 | 80.7% | 4.9% |
| Period 5 of 2026-27 | 2,506 | 80.7% | 6.2% |
| Period 4 of 2026-27 | 2,496 | 84.3% | 1.6% |
| Period 3 of 2026-27 | 2,435 | 84.1% | 5.0% |
| Period 2 of 2026-27 | 2,452 | 85.0% | 2.4% |
| Period 1 of 2026-27 | 2,819 | 84.7% | 4.8% |
| Period 13 of 2025-26 | 2,759 | 85.9% | 2.8% |
| Period 12 of 2025-26 | 2,504 | 83.8% | 3.2% |
| Period 11 of 2025-26 | 2,506 | 83.4% | 5.5% |
| Period 10 of 2025-26 | 2,172 | 80.8% | 3.4% |
| Period 9 of 2025-26 | 2,503 | 78.9% | 3.8% |
| Period 8 of 2025-26 | 2,504 | 79.6% | 4.8% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Twyford
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Great Western Railway | 51,537 | 86.9% | 3.2% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out