GTR at Tonbridge
How this operator is doing here
GTR had 15,624 scheduled stops at Tonbridge in the 13 periods to Period 7 of 2026-27, 18% of the station's total. 84.7% of recorded arrivals came within three minutes and 1.3% of stops were cancelled.
GTR trains at Tonbridge also serve Leigh (Kent) (4.1 km west, 87.4% on time, 1.4% cancelled), Penshurst (6.8 km west, 88.7% on time, 1.4% cancelled), Ashurst (Kent) (10.7 km south-west, 74.6% on time, 4.4% cancelled), Sevenoaks (11.3 km north-west, 90.6% on time, 2.6% cancelled), Cowden (Kent) (11.8 km west, 68.4% on time, 4.4% cancelled) and Bat and Ball (12.2 km north-west, 91.9% on time, 3.1% cancelled), which are the stations on its network closest to Tonbridge.
Within 30 km of here, GTR runs best at Bat and Ball, 12.2 km north-west (91.9%), and worst at Kenley, 29.8 km north-west (66.9%).
The busiest GTR station within 30 km of Tonbridge is Oxted, 20.5 km west, with about 112 scheduled stops a day.
Of the 2 operators with enough records at Tonbridge, GTR is the most punctual, at 84.7%.
GTR at Tonbridge has slipped a little, from 88.9% within three minutes in the previous 13 periods to 84.7% in the latest 13, a fall of 4.2 percentage points. Cancellations held steady at 1.3% of scheduled stops, against 1.6% before.
Period by period
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 1,196 | 46.4% | 1.0% |
| Period 6 of 2026-27 | 1,188 | 62.0% | 1.4% |
| Period 5 of 2026-27 | 1,199 | 89.1% | 3.3% |
| Period 4 of 2026-27 | 1,240 | 94.1% | 2.2% |
| Period 3 of 2026-27 | 1,199 | 92.5% | 1.3% |
| Period 2 of 2026-27 | 1,179 | 93.9% | 0.5% |
| Period 1 of 2026-27 | 1,399 | 92.4% | 0.6% |
| Period 13 of 2025-26 | 1,330 | 93.1% | 0.5% |
| Period 12 of 2025-26 | 1,232 | 92.7% | 0.0% |
| Period 11 of 2025-26 | 1,029 | 90.3% | 1.2% |
| Period 10 of 2025-26 | 977 | 84.3% | 2.3% |
| Period 9 of 2025-26 | 1,220 | 83.8% | 2.0% |
| Period 8 of 2025-26 | 1,236 | 84.1% | 1.0% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tonbridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Southeastern | 73,402 | 74.3% | 1.5% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out