Southeastern had 73,402 scheduled stops at Tonbridge in the 13 periods to Period 7 of 2026-27, 82% of the station's total. 74.3% of recorded arrivals came within three minutes and 1.5% of stops were cancelled.
Southeastern trains at Tonbridge also serve Hildenborough (3.9 km north-west, 70.3% on time, 2.1% cancelled), High Brooms (4.7 km south, 73.0% on time, 2.2% cancelled), Tunbridge Wells (6.8 km south, 73.2% on time, 2.2% cancelled), Paddock Wood (8.4 km east, 83.4% on time, 1.1% cancelled), Beltring (9.4 km east, 94.7% on time, 1.8% cancelled) and Frant (9.8 km south, 75.1% on time, 1.8% cancelled), which are the stations on its network closest to Tonbridge.
Within 30 km of here, Southeastern runs best at Bromley North, 29.9 km north-west (99.2%), and worst at Hildenborough, 3.9 km north-west (70.3%).
The busiest Southeastern station within 30 km of Tonbridge is Orpington, 23.9 km north-west, with about 344 scheduled stops a day.
Of the 2 operators with enough records at Tonbridge, Southeastern is the least punctual, at 74.3%.
For Southeastern, Tonbridge is the 157th best of 173 ranked stations. Its 74.3% here is 9.9 percentage points below the 84.2% across the whole network.
Southeastern at Tonbridge has not moved in one direction over three full railway years: 78.5% within three minutes in 2023-24, 76.0% in 2024-25 and 76.9% in 2025-26.
Period by period
See how Southeastern Delay Repay works
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 5,524 | 62.0% | 1.7% |
| Period 6 of 2026-27 | 5,582 | 60.1% | 1.4% |
| Period 5 of 2026-27 | 5,664 | 70.8% | 2.3% |
| Period 4 of 2026-27 | 5,633 | 79.4% | 0.9% |
| Period 3 of 2026-27 | 5,713 | 76.6% | 1.8% |
| Period 2 of 2026-27 | 5,438 | 80.0% | 1.7% |
| Period 1 of 2026-27 | 6,362 | 83.0% | 1.2% |
| Period 13 of 2025-26 | 6,217 | 79.0% | 1.5% |
| Period 12 of 2025-26 | 5,710 | 80.3% | 1.2% |
| Period 11 of 2025-26 | 5,632 | 78.7% | 1.2% |
| Period 10 of 2025-26 | 4,535 | 74.8% | 1.7% |
| Period 9 of 2025-26 | 5,683 | 68.3% | 2.3% |
| Period 8 of 2025-26 | 5,709 | 71.3% | 1.1% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Other operators at Tonbridge
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 15,624 | 84.7% | 1.3% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out