Stevenage
SVGEast of EnglandManaged by Govia Thameslink Railway (Great Northern)
How this station is performing
Stevenage had 129,081 scheduled stops to Period 7 of 2026-27, about 355 a day. 77.7% of recorded arrivals were within three minutes of the timetable and 5.5% of scheduled stops were cancelled.
Stevenage opened on 7 August 1850. It was moved to the site it uses now on 23 July 1973. Of the 5 stations nearest to it with a known opening date, Stevenage is the oldest; the next oldest, Hitchin, dates from 1850.
The nearest stations to Stevenage are Knebworth (4.1 km south), Hitchin (6.8 km north-west), Watton-At-Stone (7.9 km south-east), Welwyn North (8.7 km south) and Letchworth Garden City (8.9 km north). 5 stations lie within 10 km in all. Of the five, Watton-At-Stone is the most punctual at 90.4% and Welwyn North the least at 72.5%, with Stevenage on 77.7%.
Stevenage takes its name from a new town (UK) called Stevenage, home to about 89,663 people, and the station stands 0.4 km from its centre.
5 operators call at Stevenage: GTR (80.7%, 80% of stops), LNER (65.9%, 17% of stops), Lumo (East Coast) (67.0%, 2% of stops), Hull Trains (–, 0% of stops) and Grand Central (–, 0% of stops). The operator you travel with matters: GTR reaches 80.7% within three minutes while LNER manages 65.9%, a gap of 14.8 percentage points.
1 of 3 stations of a similar size in East of England are more punctual than Stevenage on 77.7%. The comparison group includes Cambridge (75.8%), St Albans City (72.2%) and Brentwood (87.5%).
Period by period
Operators calling here
| Operator | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| GTR | 103,894 | 80.7% | 6.1% |
| LNER | 22,003 | 65.9% | 3.3% |
| Lumo (East Coast) | 3,117 | 67.0% | 1.3% |
| Hull Trains | 63 | – | – |
| Grand Central | 4 | – | – |
Operators with their own page for this station are linked to it.
Late train at Stevenage? Delay Repay
These operators call at Stevenage and publish Delay Repay rules.
- GTR: pays for a delay of 15 minutes or more, starting at 25% of a single ticket
- LNER: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Lumo (East Coast): pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Hull Trains: pays for a delay of 30 minutes or more, starting at 50% of a single ticket
- Grand Central: pays for a delay of 60 minutes or more, starting at 50% of a single ticket
The last 13 periods
| Period | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Period 7 of 2026-27 | 10,244 | 72.7% | 3.8% |
| Period 6 of 2026-27 | 9,849 | 66.3% | 8.8% |
| Period 5 of 2026-27 | 10,030 | 70.9% | 7.0% |
| Period 4 of 2026-27 | 10,130 | 74.3% | 8.8% |
| Period 3 of 2026-27 | 10,282 | 79.0% | 7.0% |
| Period 2 of 2026-27 | 10,224 | 80.9% | 6.1% |
| Period 1 of 2026-27 | 11,855 | 82.4% | 5.4% |
| Period 13 of 2025-26 | 10,880 | 84.0% | 2.3% |
| Period 12 of 2025-26 | 8,442 | 80.3% | 4.4% |
| Period 11 of 2025-26 | 9,401 | 80.8% | 3.0% |
| Period 10 of 2025-26 | 8,851 | 81.6% | 2.9% |
| Period 9 of 2025-26 | 9,154 | 76.2% | 7.2% |
| Period 8 of 2025-26 | 9,739 | 79.5% | 4.3% |
Time of year
Each point averages that period of the railway year over every year in the data. Period 1 starts in April.
Similar stations in East of England
| Station | Scheduled stops | Within 3 min | Cancelled |
|---|---|---|---|
| Cambridge | 132,053 | 75.8% | 5.6% |
| St Albans City | 119,860 | 72.2% | 5.3% |
| Brentwood | 109,118 | 87.5% | 3.1% |
On time here means a recorded stop occurred within three minutes of the timetable. Cancelled means a scheduled stop that did not occur. Source: Office of Rail and Road table 3130, Network Rail operational data, in four-week periods. How the figures are worked out